Skip to main content
RateWatt

Solar power plant, Texas

Emerald Grove solar power plant, Texas

Emerald Grove is a 108 MW solar power plant in Pecos County, Texas, operated by Luminant Generation Company LLC, and it generated 256,324 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 78th percentile of U.S. solar plants. By 2025 generation it ranks 2,180th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

108 MWNameplate capacity
27%Capacity factor, 2025, 78th percentile, on 108 MW net summer
2,180thU.S. rank by generation, 2025
2 yearsAverage generator age, by MW

How hard does the Emerald Grove plant run compared with other solar plants?

The Emerald Grove plant had a capacity factor of 27% in 2025 on 108 MW of net summer capacity, the 78th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 99 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Emerald Grove27%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Emerald Grove plant generating more or less than last year?

Generation at Emerald Grove fell 8.0% from 2024 to 2025, from 278,740 MWh to 256,324 MWh. Through August 2026 it is running 16.8% behind the same months of 2025.

Net generation by period
PeriodMWh
2024278,740
2025256,324
2026 through August152,250
2025, same months182,932
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202621,714
July 202621,278
June 202619,192
May 202619,734
April 202617,901
March 202621,928
February 202616,450
January 202614,053
December 202513,598
November 202516,199
October 202521,074
September 202522,521
August 202527,370
July 202524,835
June 202527,129
May 202527,267
April 202517,665
March 202523,785
February 202518,178
January 202516,703
December 202414,815
November 202415,461
October 202423,075
September 202422,995
August 202431,057
July 202430,620
June 202430,561
May 202423,847
April 202426,694
March 202422,214
February 202418,786
January 202418,615

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Emerald Grove plant?

Emerald Grove made 0.0% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 489th largest of 1,023 plants in Texas, the 2,462nd largest of 14,327 in the U.S. and the 409th largest of 7,223 solar plants. By 2025 generation it is the 414th largest of 816 generating plants in the state.

Emerald Grove within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)108195,9660.1%
Generation (MWh)256,324592,896,1760.0%
Solar capacity (MW)10830,7390.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Emerald Grove plant, and when do they retire?

1 operable generator totals 108 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1108100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
UNIT1OperatingSolar Photovoltaic1082023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Emerald Grove plant?

EIA lists no joint owners for Emerald Grove. Luminant Generation Company LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Emerald Grove plant?

Emerald Grove is in Crane, Pecos County, Texas, at 31.0933° N, 102.3596° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Emerald Grove's 108 MW is 0% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Cutlass Solar 1 LLCFort Bend111168,963
Galloway 2 Solar FarmConcho110246,701
Liberty County Solar ProjectLiberty110245,415
Emerald GrovePecos108256,324
Alamo 6Pecos105226,282
Lamesa SolarDawson102223,258
OCI Alamo 5 LLCUvalde100159,073

Source: EIA Forms EIA-860 and EIA-923, 2025.