Solar power plant, Texas
Lamesa Solar power plant, Texas
Lamesa Solar is a 102 MW solar power plant in Dawson County, Texas, operated by Southern Power Co, and it generated 223,258 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 68th percentile of U.S. solar plants. By 2025 generation it ranks 2,352nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Lamesa Solar plant run compared with other solar plants?
The Lamesa Solar plant had a capacity factor of 25% in 2025 on 100 MW of net summer capacity, the 68th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 93 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Lamesa Solar | 25% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Lamesa Solar plant generating more or less than last year?
Generation at Lamesa Solar rose 13.8% from 2024 to 2025, from 196,191 MWh to 223,258 MWh. Through August 2026 it is running 23.0% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 196,191 |
| 2025 | 223,258 |
| 2026 through August | 125,027 |
| 2025, same months | 162,319 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 24,503 |
| July 2026 | 24,697 |
| June 2026 | 14,777 |
| May 2026 | 17,745 |
| April 2026 | 10,995 |
| March 2026 | 12,431 |
| February 2026 | 9,511 |
| January 2026 | 10,368 |
| December 2025 | 10,987 |
| November 2025 | 12,367 |
| October 2025 | 17,083 |
| September 2025 | 20,502 |
| August 2025 | 24,426 |
| July 2025 | 25,127 |
| June 2025 | 23,718 |
| May 2025 | 22,530 |
| April 2025 | 19,898 |
| March 2025 | 17,453 |
| February 2025 | 14,656 |
| January 2025 | 14,511 |
| December 2024 | 11,834 |
| November 2024 | 11,640 |
| October 2024 | 17,002 |
| September 2024 | 19,964 |
| August 2024 | 22,484 |
| July 2024 | 21,277 |
| June 2024 | 21,760 |
| May 2024 | 19,665 |
| April 2024 | 13,854 |
| March 2024 | 15,099 |
| February 2024 | 11,165 |
| January 2024 | 10,447 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Lamesa Solar plant, and when do they retire?
1 operable generator totals 102 MW, with an average age of 8 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 102 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| LSPV1 | Operating | Solar Photovoltaic | 102 | 2017 | n/a |
| LSPV2 | Cancelled | Solar Photovoltaic | 100 | n/a | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Lamesa Solar plant?
BNB Lamesa Solar LLC is the only joint owner reported for Lamesa Solar, with 100.0%. Southern Power Co operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Lamesa Solar plant?
Lamesa Solar is in Lamesa, Dawson County, Texas, at 32.7156° N, 101.9265° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Lamesa Solar's 102 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Liberty County Solar Project | Liberty | 110 | 245,415 |
| Emerald Grove | Pecos | 108 | 256,324 |
| Alamo 6 | Pecos | 105 | 226,282 |
| Lamesa Solar | Dawson | 102 | 223,258 |
| OCI Alamo 5 LLC | Uvalde | 100 | 159,073 |
| OCI Alamo 7 LLC | Haskell | 100 | 231,602 |
| West of the Pecos Solar | Reeves | 100 | 244,751 |
Source: EIA Forms EIA-860 and EIA-923, 2025.