Skip to main content
RateWatt

Solar power plant, Texas

Lamesa Solar power plant, Texas

Lamesa Solar is a 102 MW solar power plant in Dawson County, Texas, operated by Southern Power Co, and it generated 223,258 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 68th percentile of U.S. solar plants. By 2025 generation it ranks 2,352nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

102 MWNameplate capacity
25%Capacity factor, 2025, 68th percentile, on 100 MW net summer
2,352ndU.S. rank by generation, 2025
8 yearsAverage generator age, by MW

How hard does the Lamesa Solar plant run compared with other solar plants?

The Lamesa Solar plant had a capacity factor of 25% in 2025 on 100 MW of net summer capacity, the 68th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 93 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Lamesa Solar25%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Lamesa Solar plant generating more or less than last year?

Generation at Lamesa Solar rose 13.8% from 2024 to 2025, from 196,191 MWh to 223,258 MWh. Through August 2026 it is running 23.0% behind the same months of 2025.

Net generation by period
PeriodMWh
2024196,191
2025223,258
2026 through August125,027
2025, same months162,319
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202624,503
July 202624,697
June 202614,777
May 202617,745
April 202610,995
March 202612,431
February 20269,511
January 202610,368
December 202510,987
November 202512,367
October 202517,083
September 202520,502
August 202524,426
July 202525,127
June 202523,718
May 202522,530
April 202519,898
March 202517,453
February 202514,656
January 202514,511
December 202411,834
November 202411,640
October 202417,002
September 202419,964
August 202422,484
July 202421,277
June 202421,760
May 202419,665
April 202413,854
March 202415,099
February 202411,165
January 202410,447

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Lamesa Solar plant?

Lamesa Solar made 0.0% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 496th largest of 1,023 plants in Texas, the 2,550th largest of 14,327 in the U.S. and the 423rd largest of 7,223 solar plants. By 2025 generation it is the 436th largest of 816 generating plants in the state.

Lamesa Solar within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)102195,9660.1%
Generation (MWh)223,258592,896,1760.0%
Solar capacity (MW)10230,7390.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Lamesa Solar plant, and when do they retire?

1 operable generator totals 102 MW, with an average age of 8 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1102100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
LSPV1OperatingSolar Photovoltaic1022017n/a
LSPV2CancelledSolar Photovoltaic100n/an/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Lamesa Solar plant?

BNB Lamesa Solar LLC is the only joint owner reported for Lamesa Solar, with 100.0%. Southern Power Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Lamesa Solar plant?

Lamesa Solar is in Lamesa, Dawson County, Texas, at 32.7156° N, 101.9265° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Lamesa Solar's 102 MW is 0% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Liberty County Solar ProjectLiberty110245,415
Emerald GrovePecos108256,324
Alamo 6Pecos105226,282
Lamesa SolarDawson102223,258
OCI Alamo 5 LLCUvalde100159,073
OCI Alamo 7 LLCHaskell100231,602
West of the Pecos SolarReeves100244,751

Source: EIA Forms EIA-860 and EIA-923, 2025.