OCI Alamo 5 LLC solar power plant, Texas

OCI Alamo 5 LLC is a 100 MW solar power plant in Uvalde County, Texas, operated by RWE Clean Energy, and it generated 159,073 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 17th percentile of U.S. solar plants. By 2025 generation it ranks 2,812th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

100 MWNameplate capacity
18%Capacity factor, 2025, 17th percentile, on 100 MW net summer
2,812thU.S. rank by generation, 2025
10 yearsAverage generator age, by MW

How hard does the OCI Alamo 5 LLC plant run compared with other solar plants?

The OCI Alamo 5 LLC plant had a capacity factor of 18% in 2025 on 100 MW of net summer capacity, the 17th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 66 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
OCI Alamo 5 LLC18%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the OCI Alamo 5 LLC plant generating more or less than last year?

Generation at OCI Alamo 5 LLC fell 14.7% from 2024 to 2025, from 186,384 MWh to 159,073 MWh.

Net generation by period
PeriodMWh
2024186,384
2025159,073
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20257,827
November 20258,760
October 202512,414
September 202514,003
August 202516,889
July 202514,230
June 202516,324
May 202516,275
April 202515,455
March 202515,724
February 202510,828
January 202510,344
December 20249,482
November 202413,867
October 202416,747
September 202417,203
August 202420,568
July 202418,672
June 202419,205
May 202414,437
April 202415,321
March 202413,744
February 202414,585
January 202412,553

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the OCI Alamo 5 LLC plant?

OCI Alamo 5 LLC made 0.0% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 503rd largest of 1,023 plants in Texas, the 2,602nd largest of 14,327 in the U.S. and the 429th largest of 7,223 solar plants. By 2025 generation it is the 466th largest of 816 generating plants in the state.

OCI Alamo 5 LLC within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)100195,9660.1%
Generation (MWh)159,073592,896,1760.0%
Solar capacity (MW)10030,7390.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the OCI Alamo 5 LLC plant, and when do they retire?

1 operable generator totals 100 MW, with an average age of 10 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1100100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
OCIA5OperatingSolar Photovoltaic1002015n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the OCI Alamo 5 LLC plant?

EIA lists no joint owners for OCI Alamo 5 LLC. RWE Clean Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the OCI Alamo 5 LLC plant?

OCI Alamo 5 LLC is in Uvalde, Uvalde County, Texas, at 29.2167° N, 99.7161° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and OCI Alamo 5 LLC's 100 MW is 0% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Emerald GrovePecos108256,324
Alamo 6Pecos105226,282
Lamesa SolarDawson102223,258
OCI Alamo 5 LLCUvalde100159,073
OCI Alamo 7 LLCHaskell100231,602
West of the Pecos SolarReeves100244,751
LapetusAndrews100221,147