Solar power plant, Texas

Lapetus solar power plant, Texas

Lapetus is a 100 MW solar power plant in Andrews County, Texas, operated by Deriva Energy, and it generated 221,147 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 66th percentile of U.S. solar plants. By 2025 generation it ranks 2,357th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

100 MWNameplate capacity
25%Capacity factor, 2025, 66th percentile, on 100 MW net summer
2,357thU.S. rank by generation, 2025
6 yearsAverage generator age, by MW

How hard does the Lapetus plant run compared with other solar plants?

The Lapetus plant had a capacity factor of 25% in 2025 on 100 MW of net summer capacity, the 66th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 92 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Lapetus25%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Lapetus plant generating more or less than last year?

Generation at Lapetus rose 14.4% from 2024 to 2025, from 193,280 MWh to 221,147 MWh. Through August 2026 it is running 34.5% behind the same months of 2025.

Net generation by period
PeriodMWh
2024193,280
2025221,147
2026 through August103,200
2025, same months157,617
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202620,934
July 202617,852
June 202613,226
May 202611,685
April 20266,938
March 20266,917
February 202614,741
January 202610,907
December 202511,439
November 202511,443
October 202516,311
September 202524,337
August 202522,586
July 202524,228
June 202519,753
May 202524,518
April 202524,909
March 202514,143
February 202514,741
January 202512,739
December 202412,457
November 202412,896
October 202418,868
September 202419,761
August 202423,291
July 202420,894
June 202421,002
May 202419,796
April 202410,815
March 202413,148
February 202410,687
January 20249,665

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Lapetus plant?

Lapetus made 0.0% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 503rd largest of 1,023 plants in Texas, the 2,602nd largest of 14,327 in the U.S. and the 441st largest of 7,223 solar plants. By 2025 generation it is the 437th largest of 816 generating plants in the state.

Lapetus within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)100195,9660.1%
Generation (MWh)221,147592,896,1760.0%
Solar capacity (MW)10030,7390.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Lapetus plant, and when do they retire?

1 operable generator totals 100 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1100100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
LAPOperatingSolar Photovoltaic1002019n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Lapetus plant?

Lapetus Energy Project, LLC is the only joint owner reported for Lapetus, with 100.0%. Deriva Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Lapetus plant?

Lapetus is in Andrews, Andrews County, Texas, at 32.4601° N, 102.6728° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Lapetus' 100 MW is 0% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
OCI Alamo 5 LLCUvalde100159,073
OCI Alamo 7 LLCHaskell100231,602
West of the Pecos SolarReeves100244,751
LapetusAndrews100221,147
BPL Crown Solar LLCFalls100211,829
BPL Sol Solar LLCFalls100207,813
Second Division SolarBrazoria100190,835