Solar power plant, Texas

Second Division Solar power plant, Texas

Second Division Solar is a 100 MW solar power plant in Brazoria County, Texas, operated by Lightsource Renewable Energy Asset Management, LLC, and it generated 190,835 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 39th percentile of U.S. solar plants. By 2025 generation it ranks 2,558th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

100 MWNameplate capacity
22%Capacity factor, 2025, 39th percentile, on 100 MW net summer
2,558thU.S. rank by generation, 2025
1 yearAverage generator age, by MW

How hard does the Second Division Solar plant run compared with other solar plants?

The Second Division Solar plant had a capacity factor of 22% in 2025 on 100 MW of net summer capacity, the 39th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 80 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Second Division Solar22%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Second Division Solar plant generating more or less than last year?

Second Division Solar generated 190,835 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 1.8% ahead of the same months of 2025. 2024 has output for only 2 months, so the two years are not compared.

Net generation by period
PeriodMWh
202414,030
2025190,835
2026 through August132,964
2025, same months130,606
Monthly generation, Nov 2024 to Aug 2026
MonthMWh
August 202623,944
July 202623,050
June 202619,047
May 202616,730
April 202611,354
March 202617,961
February 202611,820
January 20269,058
December 20259,656
November 202512,949
October 202517,468
September 202520,156
August 202520,707
July 202521,288
June 202522,480
May 202520,157
April 202515,804
March 202513,294
February 20259,366
January 20257,510
December 20249,781
November 20244,249

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Second Division Solar plant?

Second Division Solar made 0.0% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 503rd largest of 1,023 plants in Texas, the 2,602nd largest of 14,327 in the U.S. and the 473rd largest of 7,223 solar plants. By 2025 generation it is the 451st largest of 816 generating plants in the state.

Second Division Solar within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)100195,9660.1%
Generation (MWh)190,835592,896,1760.0%
Solar capacity (MW)10030,7390.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Second Division Solar plant, and when do they retire?

1 operable generator totals 100 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 more is proposed, totalling 30 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1100100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
TXSD1OperatingSolar Photovoltaic1002024n/a
TXSD2Awaiting approvalsBatteries302031n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Second Division Solar plant?

TX Gulf Solar I, LLC is the only joint owner reported for Second Division Solar, with 100.0%. Lightsource Renewable Energy Asset Management, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Second Division Solar plant?

Second Division Solar is in West Columbia, Brazoria County, Texas, at 29.1705° N, 95.7416° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Second Division Solar's 100 MW is 0% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
LapetusAndrews100221,147
BPL Crown Solar LLCFalls100211,829
BPL Sol Solar LLCFalls100207,813
Second Division SolarBrazoria100190,835
Grizzly Ridge SolarHamilton100117,694
Swift Air Solar IIIEctor10021,342
Tyson NickLamar9137,930

Source: EIA Forms EIA-860 and EIA-923, 2025.