Solar power plant, Texas
Second Division Solar power plant, Texas
Second Division Solar is a 100 MW solar power plant in Brazoria County, Texas, operated by Lightsource Renewable Energy Asset Management, LLC, and it generated 190,835 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 39th percentile of U.S. solar plants. By 2025 generation it ranks 2,558th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Second Division Solar plant run compared with other solar plants?
The Second Division Solar plant had a capacity factor of 22% in 2025 on 100 MW of net summer capacity, the 39th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 80 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Second Division Solar | 22% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Second Division Solar plant generating more or less than last year?
Second Division Solar generated 190,835 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 1.8% ahead of the same months of 2025. 2024 has output for only 2 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 14,030 |
| 2025 | 190,835 |
| 2026 through August | 132,964 |
| 2025, same months | 130,606 |
Monthly generation, Nov 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 23,944 |
| July 2026 | 23,050 |
| June 2026 | 19,047 |
| May 2026 | 16,730 |
| April 2026 | 11,354 |
| March 2026 | 17,961 |
| February 2026 | 11,820 |
| January 2026 | 9,058 |
| December 2025 | 9,656 |
| November 2025 | 12,949 |
| October 2025 | 17,468 |
| September 2025 | 20,156 |
| August 2025 | 20,707 |
| July 2025 | 21,288 |
| June 2025 | 22,480 |
| May 2025 | 20,157 |
| April 2025 | 15,804 |
| March 2025 | 13,294 |
| February 2025 | 9,366 |
| January 2025 | 7,510 |
| December 2024 | 9,781 |
| November 2024 | 4,249 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Second Division Solar plant, and when do they retire?
1 operable generator totals 100 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 more is proposed, totalling 30 MW.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 100 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| TXSD1 | Operating | Solar Photovoltaic | 100 | 2024 | n/a |
| TXSD2 | Awaiting approvals | Batteries | 30 | 2031 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Second Division Solar plant?
TX Gulf Solar I, LLC is the only joint owner reported for Second Division Solar, with 100.0%. Lightsource Renewable Energy Asset Management, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Second Division Solar plant?
Second Division Solar is in West Columbia, Brazoria County, Texas, at 29.1705° N, 95.7416° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Second Division Solar's 100 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Lapetus | Andrews | 100 | 221,147 |
| BPL Crown Solar LLC | Falls | 100 | 211,829 |
| BPL Sol Solar LLC | Falls | 100 | 207,813 |
| Second Division Solar | Brazoria | 100 | 190,835 |
| Grizzly Ridge Solar | Hamilton | 100 | 117,694 |
| Swift Air Solar III | Ector | 100 | 21,342 |
| Tyson Nick | Lamar | 91 | 37,930 |
Source: EIA Forms EIA-860 and EIA-923, 2025.