Solar power plant, Texas
Grizzly Ridge Solar power plant, Texas
Grizzly Ridge Solar is a 100 MW solar power plant in Hamilton County, Texas, operated by Grizzly Ridge Solar LLC, and it generated 117,694 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 10th percentile of U.S. solar plants. By 2025 generation it ranks 3,226th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Grizzly Ridge Solar plant run compared with other solar plants?
The Grizzly Ridge Solar plant had a capacity factor of 13% in 2025 on 100 MW of net summer capacity, the 10th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 49 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Grizzly Ridge Solar | 13% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Grizzly Ridge Solar plant generating more or less than last year?
Generation at Grizzly Ridge Solar fell 26.3% from 2024 to 2025, from 159,622 MWh to 117,694 MWh. Through August 2026 it is running 99.8% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 159,622 |
| 2025 | 117,694 |
| 2026 through August | 181 |
| 2025, same months | 91,807 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 181 |
| July 2026 | 0 |
| June 2026 | 0 |
| May 2026 | 0 |
| April 2026 | 0 |
| March 2026 | 0 |
| February 2026 | 0 |
| January 2026 | 0 |
| December 2025 | 0 |
| November 2025 | 1,126 |
| October 2025 | 10,743 |
| September 2025 | 14,018 |
| August 2025 | 9,027 |
| July 2025 | 14,700 |
| June 2025 | 16,434 |
| May 2025 | 14,811 |
| April 2025 | 12,118 |
| March 2025 | 9,110 |
| February 2025 | 8,033 |
| January 2025 | 7,574 |
| December 2024 | 8,386 |
| November 2024 | 8,380 |
| October 2024 | 14,721 |
| September 2024 | 19,874 |
| August 2024 | 26,810 |
| July 2024 | 25,520 |
| June 2024 | 11,879 |
| May 2024 | 4,725 |
| April 2024 | 3,342 |
| March 2024 | 11,786 |
| February 2024 | 12,025 |
| January 2024 | 12,174 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Grizzly Ridge Solar plant, and when do they retire?
1 operable generator totals 100 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 more is proposed, totalling 10 MW.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 100 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 375 | Operating | Solar Photovoltaic | 100 | 2023 | n/a |
| 596 | Built, not yet operating | Batteries | 10 | 2026 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Grizzly Ridge Solar plant?
EIA lists no joint owners for Grizzly Ridge Solar. Grizzly Ridge Solar LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Grizzly Ridge Solar plant?
Grizzly Ridge Solar is in Hamilton County, Hamilton County, Texas, at 31.7382° N, 98.2137° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Grizzly Ridge Solar's 100 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| BPL Crown Solar LLC | Falls | 100 | 211,829 |
| BPL Sol Solar LLC | Falls | 100 | 207,813 |
| Second Division Solar | Brazoria | 100 | 190,835 |
| Grizzly Ridge Solar | Hamilton | 100 | 117,694 |
| Swift Air Solar III | Ector | 100 | 21,342 |
| Tyson Nick | Lamar | 91 | 37,930 |
| G.S.E. One LLC | Fannin | 83 | 159,826 |
Source: EIA Forms EIA-860 and EIA-923, 2025.