Solar power plant, Texas
G.S.E. One LLC solar power plant, Texas
G.S.E. One LLC is a 83 MW solar power plant in Fannin County, Texas, operated by GSEone, and it generated 159,826 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 42nd percentile of U.S. solar plants. By 2025 generation it ranks 2,808th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the G.S.E. One LLC plant run compared with other solar plants?
The G.S.E. One LLC plant had a capacity factor of 22% in 2025 on 82.5 MW of net summer capacity, the 42nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 81 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| G.S.E. One LLC | 22% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the G.S.E. One LLC plant generating more or less than last year?
Generation at G.S.E. One LLC fell 4.0% from 2024 to 2025, from 166,492 MWh to 159,826 MWh. Through August 2026 it is running 9.0% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 166,492 |
| 2025 | 159,826 |
| 2026 through August | 102,951 |
| 2025, same months | 113,174 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 17,757 |
| July 2026 | 19,438 |
| June 2026 | 15,716 |
| May 2026 | 14,756 |
| April 2026 | 10,128 |
| March 2026 | 11,704 |
| February 2026 | 6,309 |
| January 2026 | 7,143 |
| December 2025 | 7,380 |
| November 2025 | 9,826 |
| October 2025 | 12,663 |
| September 2025 | 16,783 |
| August 2025 | 17,337 |
| July 2025 | 20,059 |
| June 2025 | 18,475 |
| May 2025 | 16,955 |
| April 2025 | 13,079 |
| March 2025 | 10,368 |
| February 2025 | 8,592 |
| January 2025 | 8,309 |
| December 2024 | 6,409 |
| November 2024 | 10,020 |
| October 2024 | 15,682 |
| September 2024 | 16,954 |
| August 2024 | 20,248 |
| July 2024 | 19,912 |
| June 2024 | 19,845 |
| May 2024 | 15,608 |
| April 2024 | 12,354 |
| March 2024 | 13,011 |
| February 2024 | 8,947 |
| January 2024 | 7,502 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the G.S.E. One LLC plant, and when do they retire?
1 operable generator totals 83 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 83 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Solar Photovoltaic | 83 | 2021 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the G.S.E. One LLC plant?
EIA lists no joint owners for G.S.E. One LLC. GSEone operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the G.S.E. One LLC plant?
G.S.E. One LLC is in Bonham, Fannin County, Texas, at 33.5004° N, 96.1465° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and G.S.E. One LLC's 83 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Grizzly Ridge Solar | Hamilton | 100 | 117,694 |
| Swift Air Solar III | Ector | 100 | 21,342 |
| Tyson Nick | Lamar | 91 | 37,930 |
| G.S.E. One LLC | Fannin | 83 | 159,826 |
| Ellis Solar LLC | Ellis | 80 | 165,050 |
| Longbow Solar, LLC | Brazoria | 78 | 141,035 |
| Dileo Solar | Hill | 71 | 153,941 |
Source: EIA Forms EIA-860 and EIA-923, 2025.