West of the Pecos Solar is a 100 MW solar power plant in Reeves County, Texas, operated by RWE Clean Energy, and it generated 244,751 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 82nd percentile of U.S. solar plants. By 2025 generation it ranks 2,255th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

100 MWNameplate capacity
28%Capacity factor, 2025, 82nd percentile, on 100 MW net summer
2,255thU.S. rank by generation, 2025
6 yearsAverage generator age, by MW

How hard does the West of the Pecos Solar plant run compared with other solar plants?

The West of the Pecos Solar plant had a capacity factor of 28% in 2025 on 100 MW of net summer capacity, the 82nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 102 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
West of the Pecos Solar28%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the West of the Pecos Solar plant generating more or less than last year?

Generation at West of the Pecos Solar rose 4.5% from 2024 to 2025, from 234,197 MWh to 244,751 MWh. Through August 2026 it is running 20.9% behind the same months of 2025.

Net generation by period
PeriodMWh
2024234,197
2025244,751
2026 through August140,400
2025, same months177,469
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202623,417
July 202615,126
June 202616,529
May 202621,921
April 202619,448
March 202617,385
February 202614,122
January 202612,452
December 202512,923
November 202513,679
October 202519,296
September 202521,384
August 202524,178
July 202525,565
June 202521,633
May 202526,776
April 202524,678
March 202521,143
February 202518,129
January 202515,367
December 202414,375
November 202415,715
October 202420,829
September 202422,332
August 202426,774
July 202424,772
June 202423,888
May 202423,988
April 202414,686
March 202415,114
February 202415,863
January 202415,861

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the West of the Pecos Solar plant?

West of the Pecos Solar made 0.0% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. By capacity it is the 503rd largest of 1,023 plants in Texas, the 2,602nd largest of 14,327 in the U.S. and the 440th largest of 7,223 solar plants. By 2025 generation it is the 426th largest of 816 generating plants in the state.

West of the Pecos Solar within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)100195,9660.1%
Generation (MWh)244,751592,896,1760.0%
Solar capacity (MW)10030,7390.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the West of the Pecos Solar plant, and when do they retire?

1 operable generator totals 100 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1100100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
WOTP1OperatingSolar Photovoltaic1002019n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the West of the Pecos Solar plant?

EIA lists no joint owners for West of the Pecos Solar. RWE Clean Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the West of the Pecos Solar plant?

West of the Pecos Solar is in TBD, Reeves County, Texas, at 31.4308° N, 103.7289° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and West of the Pecos Solar's 100 MW is 0% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Lamesa SolarDawson102223,258
OCI Alamo 5 LLCUvalde100159,073
OCI Alamo 7 LLCHaskell100231,602
West of the Pecos SolarReeves100244,751
LapetusAndrews100221,147
BPL Crown Solar LLCFalls100211,829
BPL Sol Solar LLCFalls100207,813

Source: EIA Forms EIA-860 and EIA-923, 2025.