Solar power plant, Texas
Liberty County Solar Project, Texas
Liberty County Solar Project is a 110 MW solar power plant in Liberty County, Texas, operated by Liberty County Solar Project, LLC, and it generated 245,415 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 83rd percentile of U.S. solar plants. By 2025 generation it ranks 2,252nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Liberty County Solar Project plant run compared with other solar plants?
The Liberty County Solar Project plant had a capacity factor of 28% in 2025 on 100 MW of net summer capacity, the 83rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 102 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Liberty County Solar Project | 28% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Liberty County Solar Project plant generating more or less than last year?
Liberty County Solar Project generated 245,415 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 1.7% ahead of the same months of 2025. 2024 has output for only 4 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 50,257 |
| 2025 | 245,415 |
| 2026 through August | 172,268 |
| 2025, same months | 169,306 |
Monthly generation, Sep 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 27,621 |
| July 2026 | 26,486 |
| June 2026 | 22,077 |
| May 2026 | 21,652 |
| April 2026 | 18,298 |
| March 2026 | 23,516 |
| February 2026 | 17,356 |
| January 2026 | 15,262 |
| December 2025 | 12,128 |
| November 2025 | 16,730 |
| October 2025 | 23,109 |
| September 2025 | 24,143 |
| August 2025 | 24,205 |
| July 2025 | 24,148 |
| June 2025 | 26,987 |
| May 2025 | 23,431 |
| April 2025 | 21,731 |
| March 2025 | 22,490 |
| February 2025 | 13,749 |
| January 2025 | 12,564 |
| December 2024 | 13,213 |
| November 2024 | 14,954 |
| October 2024 | 21,521 |
| September 2024 | 569 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Liberty County Solar Project plant, and when do they retire?
1 operable generator totals 110 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 110 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| LIBCO | Operating | Solar Photovoltaic | 110 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Liberty County Solar Project plant?
EIA lists no joint owners for Liberty County Solar Project. Liberty County Solar Project, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Liberty County Solar Project plant?
Liberty County Solar Project is in Dayton, Liberty County, Texas, at 29.9589° N, 94.8505° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Liberty County Solar Project's 110 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Bluebell Solar II | Sterling | 115 | 254,548 |
| Cutlass Solar 1 LLC | Fort Bend | 111 | 168,963 |
| Galloway 2 Solar Farm | Concho | 110 | 246,701 |
| Liberty County Solar Project | Liberty | 110 | 245,415 |
| Emerald Grove | Pecos | 108 | 256,324 |
| Alamo 6 | Pecos | 105 | 226,282 |
| Lamesa Solar | Dawson | 102 | 223,258 |
Source: EIA Forms EIA-860 and EIA-923, 2025.