Solar power plant, Texas
Galloway 2 Solar Farm, Texas
Galloway 2 Solar Farm is a 110 MW solar power plant in Concho County, Texas, operated by 224WB 8me LLC, and it generated 246,701 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 69th percentile of U.S. solar plants. By 2025 generation it ranks 2,247th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Galloway 2 Solar Farm plant run compared with other solar plants?
The Galloway 2 Solar Farm plant had a capacity factor of 26% in 2025 on 110 MW of net summer capacity, the 69th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 93 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Galloway 2 Solar Farm | 26% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Galloway 2 Solar Farm plant generating more or less than last year?
Generation at Galloway 2 Solar Farm rose 7.1% from 2024 to 2025, from 230,360 MWh to 246,701 MWh. Through August 2026 it is running 13.2% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 230,360 |
| 2025 | 246,701 |
| 2026 through August | 144,347 |
| 2025, same months | 166,338 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 29,159 |
| July 2026 | 29,427 |
| June 2026 | 14,882 |
| May 2026 | 20,146 |
| April 2026 | 14,348 |
| March 2026 | 11,430 |
| February 2026 | 11,873 |
| January 2026 | 13,082 |
| December 2025 | 14,776 |
| November 2025 | 17,153 |
| October 2025 | 21,715 |
| September 2025 | 26,719 |
| August 2025 | 29,457 |
| July 2025 | 25,954 |
| June 2025 | 25,285 |
| May 2025 | 24,037 |
| April 2025 | 19,389 |
| March 2025 | 14,936 |
| February 2025 | 14,454 |
| January 2025 | 12,826 |
| December 2024 | 12,748 |
| November 2024 | 16,145 |
| October 2024 | 21,643 |
| September 2024 | 24,911 |
| August 2024 | 31,165 |
| July 2024 | 27,436 |
| June 2024 | 21,984 |
| May 2024 | 15,130 |
| April 2024 | 14,852 |
| March 2024 | 18,718 |
| February 2024 | 13,394 |
| January 2024 | 12,234 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Galloway 2 Solar Farm plant, and when do they retire?
1 operable generator totals 110 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 110 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GS2SF | Operating | Solar Photovoltaic | 110 | 2023 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Galloway 2 Solar Farm plant?
EIA lists no joint owners for Galloway 2 Solar Farm. 224WB 8me LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Galloway 2 Solar Farm plant?
Galloway 2 Solar Farm is in Paint Rock, Concho County, Texas, at 31.4462° N, 99.9030° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Galloway 2 Solar Farm's 110 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| East Pecos Solar | Pecos | 119 | 219,423 |
| Bluebell Solar II | Sterling | 115 | 254,548 |
| Cutlass Solar 1 LLC | Fort Bend | 111 | 168,963 |
| Galloway 2 Solar Farm | Concho | 110 | 246,701 |
| Liberty County Solar Project | Liberty | 110 | 245,415 |
| Emerald Grove | Pecos | 108 | 256,324 |
| Alamo 6 | Pecos | 105 | 226,282 |
Source: EIA Forms EIA-860 and EIA-923, 2025.