Skip to main content
RateWatt

Solar power plant, Texas

Galloway 2 Solar Farm, Texas

Galloway 2 Solar Farm is a 110 MW solar power plant in Concho County, Texas, operated by 224WB 8me LLC, and it generated 246,701 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 69th percentile of U.S. solar plants. By 2025 generation it ranks 2,247th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

110 MWNameplate capacity
26%Capacity factor, 2025, 69th percentile, on 110 MW net summer
2,247thU.S. rank by generation, 2025
2 yearsAverage generator age, by MW

How hard does the Galloway 2 Solar Farm plant run compared with other solar plants?

The Galloway 2 Solar Farm plant had a capacity factor of 26% in 2025 on 110 MW of net summer capacity, the 69th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 93 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Galloway 2 Solar Farm26%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Galloway 2 Solar Farm plant generating more or less than last year?

Generation at Galloway 2 Solar Farm rose 7.1% from 2024 to 2025, from 230,360 MWh to 246,701 MWh. Through August 2026 it is running 13.2% behind the same months of 2025.

Net generation by period
PeriodMWh
2024230,360
2025246,701
2026 through August144,347
2025, same months166,338
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202629,159
July 202629,427
June 202614,882
May 202620,146
April 202614,348
March 202611,430
February 202611,873
January 202613,082
December 202514,776
November 202517,153
October 202521,715
September 202526,719
August 202529,457
July 202525,954
June 202525,285
May 202524,037
April 202519,389
March 202514,936
February 202514,454
January 202512,826
December 202412,748
November 202416,145
October 202421,643
September 202424,911
August 202431,165
July 202427,436
June 202421,984
May 202415,130
April 202414,852
March 202418,718
February 202413,394
January 202412,234

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Galloway 2 Solar Farm plant?

Galloway 2 Solar Farm made 0.0% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 485th largest of 1,023 plants in Texas, the 2,430th largest of 14,327 in the U.S. and the 400th largest of 7,223 solar plants. By 2025 generation it is the 424th largest of 816 generating plants in the state.

Galloway 2 Solar Farm within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)110195,9660.1%
Generation (MWh)246,701592,896,1760.0%
Solar capacity (MW)11030,7390.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Galloway 2 Solar Farm plant, and when do they retire?

1 operable generator totals 110 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1110100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GS2SFOperatingSolar Photovoltaic1102023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Galloway 2 Solar Farm plant?

EIA lists no joint owners for Galloway 2 Solar Farm. 224WB 8me LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Galloway 2 Solar Farm plant?

Galloway 2 Solar Farm is in Paint Rock, Concho County, Texas, at 31.4462° N, 99.9030° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Galloway 2 Solar Farm's 110 MW is 0% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
East Pecos SolarPecos119219,423
Bluebell Solar IISterling115254,548
Cutlass Solar 1 LLCFort Bend111168,963
Galloway 2 Solar FarmConcho110246,701
Liberty County Solar ProjectLiberty110245,415
Emerald GrovePecos108256,324
Alamo 6Pecos105226,282

Source: EIA Forms EIA-860 and EIA-923, 2025.