Swift Air Solar I power plant, Texas

Swift Air Solar I is a 145 MW solar power plant in Ector County, Texas, operated by Origis Energy USA, Inc, and it generated 311,507 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 61st percentile of U.S. solar plants. By 2025 generation it ranks 1,928th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

145 MWNameplate capacity
25%Capacity factor, 2025, 61st percentile, on 145 MW net summer
0.1%Of TX generation, 2025
Under 1 yearAverage generator age, by MW

How hard does the Swift Air Solar I plant run compared with other solar plants?

The Swift Air Solar I plant had a capacity factor of 25% in 2025 on 145 MW of net summer capacity, the 61st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 90 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Swift Air Solar I25%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Swift Air Solar I plant generating more or less than last year?

Swift Air Solar I generated 311,507 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 32.0% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024n/a
2025311,507
2026 through August253,828
2025, same months192,345
Monthly generation, Apr 2025 to Aug 2026
MonthMWh
August 202636,400
July 202633,798
June 202626,920
May 202636,163
April 202629,653
March 202637,735
February 202627,433
January 202625,726
December 202522,643
November 202527,402
October 202533,363
September 202535,754
August 202539,562
July 202541,995
June 202540,777
May 202541,671
April 202528,340

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Swift Air Solar I plant?

Swift Air Solar I made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 437th largest of 1,023 plants in Texas, the 2,107th largest of 14,327 in the U.S. and the 321st largest of 7,223 solar plants. By 2025 generation it is the 383rd largest of 816 generating plants in the state.

Swift Air Solar I within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)145195,9660.1%
Generation (MWh)311,507592,896,1760.1%
Solar capacity (MW)14530,7390.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Swift Air Solar I plant, and when do they retire?

1 operable generator totals 145 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1145100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
OSAS1OperatingSolar Photovoltaic1452025n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Swift Air Solar I plant?

EIA lists no joint owners for Swift Air Solar I. Origis Energy USA, Inc operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Swift Air Solar I plant?

Swift Air Solar I is in Goldsmith, Ector County, Texas, at 31.7688° N, 102.6960° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Swift Air Solar I's 145 MW is 0% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Copperhead Solar, LLCMcLennan150300,799
Peacock Energy ProjectSan Patricio150307,244
Lily Solar HybridKaufman147320,782
Swift Air Solar IEctor145311,507
East Blackland Solar Project 1Travis144277,344
Starr Solar RanchStarr136272,169
Nebula SolarCameron135291,345

Source: EIA Forms EIA-860 and EIA-923, 2025.