Solar power plant, Texas
Swift Air Solar I power plant, Texas
Swift Air Solar I is a 145 MW solar power plant in Ector County, Texas, operated by Origis Energy USA, Inc, and it generated 311,507 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 61st percentile of U.S. solar plants. By 2025 generation it ranks 1,928th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Swift Air Solar I plant run compared with other solar plants?
The Swift Air Solar I plant had a capacity factor of 25% in 2025 on 145 MW of net summer capacity, the 61st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 90 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Swift Air Solar I | 25% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Swift Air Solar I plant generating more or less than last year?
Swift Air Solar I generated 311,507 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 32.0% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 311,507 |
| 2026 through August | 253,828 |
| 2025, same months | 192,345 |
Monthly generation, Apr 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 36,400 |
| July 2026 | 33,798 |
| June 2026 | 26,920 |
| May 2026 | 36,163 |
| April 2026 | 29,653 |
| March 2026 | 37,735 |
| February 2026 | 27,433 |
| January 2026 | 25,726 |
| December 2025 | 22,643 |
| November 2025 | 27,402 |
| October 2025 | 33,363 |
| September 2025 | 35,754 |
| August 2025 | 39,562 |
| July 2025 | 41,995 |
| June 2025 | 40,777 |
| May 2025 | 41,671 |
| April 2025 | 28,340 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Swift Air Solar I plant, and when do they retire?
1 operable generator totals 145 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 145 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| OSAS1 | Operating | Solar Photovoltaic | 145 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Swift Air Solar I plant?
EIA lists no joint owners for Swift Air Solar I. Origis Energy USA, Inc operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Swift Air Solar I plant?
Swift Air Solar I is in Goldsmith, Ector County, Texas, at 31.7688° N, 102.6960° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Swift Air Solar I's 145 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Copperhead Solar, LLC | McLennan | 150 | 300,799 |
| Peacock Energy Project | San Patricio | 150 | 307,244 |
| Lily Solar Hybrid | Kaufman | 147 | 320,782 |
| Swift Air Solar I | Ector | 145 | 311,507 |
| East Blackland Solar Project 1 | Travis | 144 | 277,344 |
| Starr Solar Ranch | Starr | 136 | 272,169 |
| Nebula Solar | Cameron | 135 | 291,345 |
Source: EIA Forms EIA-860 and EIA-923, 2025.