Solar power plant, Texas
Lily Solar Hybrid power plant, Texas
Lily Solar Hybrid is a 202 MW power plant, 147 MW of it solar, in Kaufman County, Texas, operated by Lily Solar, LLC, and it generated 318,358 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 65th percentile of U.S. solar plants. By 2025 generation it ranks 1,894th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Lily Solar Hybrid plant run compared with other solar plants?
The Lily Solar Hybrid plant's solar units had a capacity factor of 25% in 2025 on 146 MW of net summer capacity, the 65th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 92 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Lily Solar Hybrid | 25% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Lily Solar Hybrid plant generating more or less than last year?
Generation at Lily Solar Hybrid rose 3.1% from 2024 to 2025, from 308,827 MWh to 318,358 MWh. Through August 2026 it is running 0.4% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 308,827 |
| 2025 | 318,358 |
| 2026 through August | 225,549 |
| 2025, same months | 224,596 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 39,232 |
| July 2026 | 39,854 |
| June 2026 | 32,573 |
| May 2026 | 30,201 |
| April 2026 | 22,290 |
| March 2026 | 25,644 |
| February 2026 | 18,302 |
| January 2026 | 17,453 |
| December 2025 | 14,706 |
| November 2025 | 20,648 |
| October 2025 | 26,819 |
| September 2025 | 31,589 |
| August 2025 | 33,869 |
| July 2025 | 36,983 |
| June 2025 | 33,718 |
| May 2025 | 29,206 |
| April 2025 | 26,298 |
| March 2025 | 28,082 |
| February 2025 | 17,953 |
| January 2025 | 18,487 |
| December 2024 | 12,907 |
| November 2024 | 11,511 |
| October 2024 | 29,821 |
| September 2024 | 28,842 |
| August 2024 | 37,942 |
| July 2024 | 37,178 |
| June 2024 | 37,930 |
| May 2024 | 27,468 |
| April 2024 | 23,145 |
| March 2024 | 24,516 |
| February 2024 | 20,737 |
| January 2024 | 16,830 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Lily Solar Hybrid plant, and when do they retire?
2 operable generators total 202 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 202 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| LILY | Operating | Solar Photovoltaic | 147 | 2021 | n/a |
| LILYB | Operating | Batteries | 55 | 2021 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Lily Solar Hybrid plant?
EIA lists no joint owners for Lily Solar Hybrid. Lily Solar, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Lily Solar Hybrid plant use?
Lily Solar Hybrid has capacity on 2 fuels: 73% solar and 27% battery and pumped storage. In 2025, solar made 101% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 147 | 72.7% | 320,782 |
| Battery and pumped storage | 55 | 27.3% | -2,424 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Lily Solar Hybrid plant?
Lily Solar Hybrid is in Scurry, Kaufman County, Texas, at 32.5333° N, 96.4290° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Lily Solar Hybrid's 147 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Umbriel Solar | Polk | 150 | 318,883 |
| Copperhead Solar, LLC | McLennan | 150 | 300,799 |
| Peacock Energy Project | San Patricio | 150 | 307,244 |
| Lily Solar Hybrid | Kaufman | 147 | 320,782 |
| Swift Air Solar I | Ector | 145 | 311,507 |
| East Blackland Solar Project 1 | Travis | 144 | 277,344 |
| Starr Solar Ranch | Starr | 136 | 272,169 |
Source: EIA Forms EIA-860 and EIA-923, 2025.