Solar power plant, Texas
Umbriel Solar power plant, Texas
Umbriel Solar is a 150 MW solar power plant in Polk County, Texas, operated by Umbriel Solar, LLC, and it generated 318,883 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 59th percentile of U.S. solar plants. By 2025 generation it ranks 1,891st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Umbriel Solar plant run compared with other solar plants?
The Umbriel Solar plant had a capacity factor of 24% in 2025 on 150 MW of net summer capacity, the 59th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 89 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Umbriel Solar | 24% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Umbriel Solar plant generating more or less than last year?
Generation at Umbriel Solar fell 1.4% from 2024 to 2025, from 323,424 MWh to 318,883 MWh. Through August 2026 it is running 2.9% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 323,424 |
| 2025 | 318,883 |
| 2026 through August | 227,082 |
| 2025, same months | 220,582 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 37,788 |
| July 2026 | 37,140 |
| June 2026 | 30,731 |
| May 2026 | 29,674 |
| April 2026 | 22,585 |
| March 2026 | 29,755 |
| February 2026 | 21,260 |
| January 2026 | 18,149 |
| December 2025 | 14,615 |
| November 2025 | 20,657 |
| October 2025 | 30,315 |
| September 2025 | 32,714 |
| August 2025 | 29,772 |
| July 2025 | 34,710 |
| June 2025 | 32,672 |
| May 2025 | 31,194 |
| April 2025 | 28,075 |
| March 2025 | 30,352 |
| February 2025 | 17,396 |
| January 2025 | 16,411 |
| December 2024 | 16,048 |
| November 2024 | 18,651 |
| October 2024 | 33,124 |
| September 2024 | 30,993 |
| August 2024 | 38,321 |
| July 2024 | 26,032 |
| June 2024 | 39,094 |
| May 2024 | 26,151 |
| April 2024 | 28,934 |
| March 2024 | 23,384 |
| February 2024 | 23,164 |
| January 2024 | 19,528 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Umbriel Solar plant, and when do they retire?
1 operable generator totals 150 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 150 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 23001 | Operating | Solar Photovoltaic | 150 | 2023 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Umbriel Solar plant?
EIA lists no joint owners for Umbriel Solar. Umbriel Solar, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Umbriel Solar plant?
Umbriel Solar is in Livington, Polk County, Texas, at 30.6688° N, 94.7835° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Umbriel Solar's 150 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Upton County Solar | Upton | 150 | 299,145 |
| Oberon IA | Ector | 150 | 302,685 |
| Crane Solar Project | Crane | 150 | 405,477 |
| Umbriel Solar | Polk | 150 | 318,883 |
| Copperhead Solar, LLC | McLennan | 150 | 300,799 |
| Peacock Energy Project | San Patricio | 150 | 307,244 |
| Lily Solar Hybrid | Kaufman | 147 | 320,782 |
Source: EIA Forms EIA-860 and EIA-923, 2025.