Solar power plant, Texas
Copperhead Solar, LLC power plant, Texas
Copperhead Solar, LLC is a 250 MW power plant, 150 MW of it solar, in McLennan County, Texas, operated by Geronimo Power, and it generated 296,719 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 49th percentile of U.S. solar plants. By 2025 generation it ranks 1,991st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Copperhead Solar, LLC plant run compared with other solar plants?
The Copperhead Solar, LLC plant's solar units had a capacity factor of 23% in 2025 on 150 MW of net summer capacity, the 49th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 84 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Copperhead Solar, LLC | 23% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Copperhead Solar, LLC plant generating more or less than last year?
Copperhead Solar, LLC generated 296,719 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 16.4% behind the same months of 2025. 2024 has output for only 4 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 94,640 |
| 2025 | 296,719 |
| 2026 through August | 173,223 |
| 2025, same months | 207,320 |
Monthly generation, Sep 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 30,111 |
| July 2026 | 30,012 |
| June 2026 | 22,357 |
| May 2026 | 22,027 |
| April 2026 | 17,304 |
| March 2026 | 23,296 |
| February 2026 | 14,426 |
| January 2026 | 13,690 |
| December 2025 | 13,228 |
| November 2025 | 18,167 |
| October 2025 | 25,839 |
| September 2025 | 32,165 |
| August 2025 | 31,845 |
| July 2025 | 32,046 |
| June 2025 | 35,607 |
| May 2025 | 29,455 |
| April 2025 | 20,492 |
| March 2025 | 25,767 |
| February 2025 | 15,589 |
| January 2025 | 16,519 |
| December 2024 | 14,275 |
| November 2024 | 20,106 |
| October 2024 | 30,580 |
| September 2024 | 29,679 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Copperhead Solar, LLC plant, and when do they retire?
2 operable generators total 250 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 250 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CHSLR | Operating | Solar Photovoltaic | 150 | 2024 | n/a |
| CHSTG | Operating | Batteries | 100 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Copperhead Solar, LLC plant?
EIA lists no joint owners for Copperhead Solar, LLC. Geronimo Power operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Copperhead Solar, LLC plant use?
Copperhead Solar, LLC has capacity on 2 fuels: 60% solar and 40% battery and pumped storage. In 2025, solar made 101% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 150 | 60.0% | 300,799 |
| Battery and pumped storage | 100 | 40.0% | -4,080 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Copperhead Solar, LLC plant?
Copperhead Solar, LLC is in Riesel, McLennan County, Texas, at 31.4500° N, 96.8600° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Copperhead Solar, LLC's 150 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Oberon IA | Ector | 150 | 302,685 |
| Crane Solar Project | Crane | 150 | 405,477 |
| Umbriel Solar | Polk | 150 | 318,883 |
| Copperhead Solar, LLC | McLennan | 150 | 300,799 |
| Peacock Energy Project | San Patricio | 150 | 307,244 |
| Lily Solar Hybrid | Kaufman | 147 | 320,782 |
| Swift Air Solar I | Ector | 145 | 311,507 |
Source: EIA Forms EIA-860 and EIA-923, 2025.