Skip to main content
RateWatt

Solar power plant, Texas

Copperhead Solar, LLC power plant, Texas

Copperhead Solar, LLC is a 250 MW power plant, 150 MW of it solar, in McLennan County, Texas, operated by Geronimo Power, and it generated 296,719 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 49th percentile of U.S. solar plants. By 2025 generation it ranks 1,991st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

250 MWNameplate capacity
23%Capacity factor, 2025, solar units, 49th percentile, on 150 MW net summer
0.1%Of TX generation, 2025
1 yearAverage generator age, by MW

How hard does the Copperhead Solar, LLC plant run compared with other solar plants?

The Copperhead Solar, LLC plant's solar units had a capacity factor of 23% in 2025 on 150 MW of net summer capacity, the 49th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 84 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Copperhead Solar, LLC23%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Copperhead Solar, LLC plant generating more or less than last year?

Copperhead Solar, LLC generated 296,719 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 16.4% behind the same months of 2025. 2024 has output for only 4 months, so the two years are not compared.

Net generation by period
PeriodMWh
202494,640
2025296,719
2026 through August173,223
2025, same months207,320
Monthly generation, Sep 2024 to Aug 2026
MonthMWh
August 202630,111
July 202630,012
June 202622,357
May 202622,027
April 202617,304
March 202623,296
February 202614,426
January 202613,690
December 202513,228
November 202518,167
October 202525,839
September 202532,165
August 202531,845
July 202532,046
June 202535,607
May 202529,455
April 202520,492
March 202525,767
February 202515,589
January 202516,519
December 202414,275
November 202420,106
October 202430,580
September 202429,679

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Copperhead Solar, LLC plant?

Copperhead Solar, LLC made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 205th largest of 1,023 plants in Texas, the 1,239th largest of 14,327 in the U.S. and the 292nd largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 392nd largest of 816 generating plants in the state.

Copperhead Solar, LLC within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)250195,9660.1%
Generation (MWh)296,719592,896,1760.1%
Solar capacity (MW)15030,7390.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Copperhead Solar, LLC plant, and when do they retire?

2 operable generators total 250 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2250100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CHSLROperatingSolar Photovoltaic1502024n/a
CHSTGOperatingBatteries1002024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Copperhead Solar, LLC plant?

EIA lists no joint owners for Copperhead Solar, LLC. Geronimo Power operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Copperhead Solar, LLC plant use?

Copperhead Solar, LLC has capacity on 2 fuels: 60% solar and 40% battery and pumped storage. In 2025, solar made 101% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar15060.0%300,799
Battery and pumped storage10040.0%-4,080

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Copperhead Solar, LLC plant?

Copperhead Solar, LLC is in Riesel, McLennan County, Texas, at 31.4500° N, 96.8600° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Copperhead Solar, LLC's 150 MW is 0% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Oberon IAEctor150302,685
Crane Solar ProjectCrane150405,477
Umbriel SolarPolk150318,883
Copperhead Solar, LLCMcLennan150300,799
Peacock Energy ProjectSan Patricio150307,244
Lily Solar HybridKaufman147320,782
Swift Air Solar IEctor145311,507

Source: EIA Forms EIA-860 and EIA-923, 2025.