Solar power plant, Texas
Oberon IA solar power plant, Texas
Oberon IA is a 150 MW solar power plant in Ector County, Texas, operated by Oberon Solar IA, and it generated 302,685 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 49th percentile of U.S. solar plants. By 2025 generation it ranks 1,959th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Oberon IA plant run compared with other solar plants?
The Oberon IA plant had a capacity factor of 23% in 2025 on 150 MW of net summer capacity, the 49th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 84 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Oberon IA | 23% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Oberon IA plant generating more or less than last year?
Generation at Oberon IA rose 11.6% from 2024 to 2025, from 271,236 MWh to 302,685 MWh. Through August 2026 it is running 23.4% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 271,236 |
| 2025 | 302,685 |
| 2026 through August | 166,857 |
| 2025, same months | 217,816 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 34,601 |
| July 2026 | 32,319 |
| June 2026 | 19,081 |
| May 2026 | 25,415 |
| April 2026 | 13,865 |
| March 2026 | 14,220 |
| February 2026 | 14,646 |
| January 2026 | 12,710 |
| December 2025 | 13,725 |
| November 2025 | 17,968 |
| October 2025 | 24,636 |
| September 2025 | 28,540 |
| August 2025 | 34,025 |
| July 2025 | 35,233 |
| June 2025 | 27,955 |
| May 2025 | 32,248 |
| April 2025 | 27,882 |
| March 2025 | 18,849 |
| February 2025 | 23,609 |
| January 2025 | 18,015 |
| December 2024 | 17,885 |
| November 2024 | 18,285 |
| October 2024 | 23,757 |
| September 2024 | 24,993 |
| August 2024 | 32,666 |
| July 2024 | 24,249 |
| June 2024 | 22,270 |
| May 2024 | 26,906 |
| April 2024 | 21,065 |
| March 2024 | 23,001 |
| February 2024 | 17,928 |
| January 2024 | 18,231 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Oberon IA plant, and when do they retire?
1 operable generator totals 150 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 150 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| OBR1A | Operating | Solar Photovoltaic | 150 | 2020 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Oberon IA plant?
2 owners report shares in Oberon IA; 174 Power Global Corp. holds the largest named share, 50.0% or about 75 MW. Oberon Solar IA operates the plant.
| Owner | Share | MW | 2025 MWh, by share |
|---|---|---|---|
| 174 Power Global Corp. | 50.0% | 75 | 151,343 |
| TotalEnergies | 50.0% | 75 | 151,343 |
Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.
Where is the Oberon IA plant?
Oberon IA is in Odessa, Ector County, Texas, at 31.7033° N, 102.7012° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Oberon IA's 150 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Felina | El Paso | 153 | 73,775 |
| Ganado Solar | Jackson | 151 | 347,695 |
| Upton County Solar | Upton | 150 | 299,145 |
| Oberon IA | Ector | 150 | 302,685 |
| Crane Solar Project | Crane | 150 | 405,477 |
| Umbriel Solar | Polk | 150 | 318,883 |
| Copperhead Solar, LLC | McLennan | 150 | 300,799 |
Source: EIA Forms EIA-860 and EIA-923, 2025.