Geothermal power plant, Nevada
McGinness Hills 3 geothermal power plant, Nevada
McGinness Hills 3 is a 98.8 MW geothermal power plant in Lander County, Nevada, operated by Ormat Nevada Inc, and it generated 434,362 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.0% of the generation reported in Nevada, and its capacity factor sits at the 55th percentile of U.S. geothermal plants. By 2025 generation it ranks 1,500th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the McGinness Hills 3 plant run compared with other geothermal plants?
The McGinness Hills 3 plant had a capacity factor of 67% in 2025 on 74.2 MW of net summer capacity, the 55th percentile of the 49 U.S. geothermal plants with at least 20 MW. The typical geothermal plant reached 66%. That equals about 244 days at full output out of 365.
0%Shaded: the middle half of geothermal plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| McGinness Hills 3 | 67% |
| Geothermal plants, 75th percentile | 81% |
| Geothermal plants, median | 66% |
| Geothermal plants, 25th percentile | 51% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the McGinness Hills 3 plant generating more or less than last year?
Generation at McGinness Hills 3 fell 7.2% from 2024 to 2025, from 468,081 MWh to 434,362 MWh. Through August 2026 it is running 10.2% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 468,081 |
| 2025 | 434,362 |
| 2026 through August | 308,892 |
| 2025, same months | 280,206 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 31,351 |
| July 2026 | 30,589 |
| June 2026 | 32,556 |
| May 2026 | 39,535 |
| April 2026 | 42,239 |
| March 2026 | 41,667 |
| February 2026 | 42,022 |
| January 2026 | 48,933 |
| December 2025 | 45,687 |
| November 2025 | 42,571 |
| October 2025 | 30,747 |
| September 2025 | 35,151 |
| August 2025 | 33,281 |
| July 2025 | 27,853 |
| June 2025 | 33,005 |
| May 2025 | 15,040 |
| April 2025 | 35,387 |
| March 2025 | 47,971 |
| February 2025 | 43,646 |
| January 2025 | 44,023 |
| December 2024 | 40,779 |
| November 2024 | 16,069 |
| October 2024 | 32,251 |
| September 2024 | 36,672 |
| August 2024 | 34,314 |
| July 2024 | 32,031 |
| June 2024 | 30,603 |
| May 2024 | 42,782 |
| April 2024 | 46,515 |
| March 2024 | 51,580 |
| February 2024 | 50,175 |
| January 2024 | 54,310 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the McGinness Hills 3 plant, and when do they retire?
3 operable generators total 98.8 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 more is proposed, totalling 14 MW.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 2 | 74 | 75% | none reported |
| 2020s | 1 | 25 | 25% | none reported |
Every generator, 4 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| OEC31 | Operating | Geothermal | 37 | 2018 | n/a |
| OEC32 | Operating | Geothermal | 37 | 2018 | n/a |
| G1A | Operating | Geothermal | 25 | 2021 | n/a |
| MHSOL | Awaiting approvals | Solar Photovoltaic | 14 | 2027 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the McGinness Hills 3 plant?
EIA lists no joint owners for McGinness Hills 3. Ormat Nevada Inc operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the McGinness Hills 3 plant?
McGinness Hills 3 is in Austin, Lander County, Nevada, at 39.5963° N, 116.8942° W. It sits in the Nevada Power Company balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which geothermal plants in Nevada are similar in size?
Nevada has 26 operable geothermal plants with 914 MW of capacity, and McGinness Hills 3's 98.8 MW is 11% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| McGinness Hills | Lander | 104 | 568,628 |
| McGinness Hills 3 | Lander | 99 | 434,362 |
| Dixie Valley | Churchill | 71 | 422,681 |
| Tungsten Mountain | Churchill | 63 | 256,243 |
Source: EIA Forms EIA-860 and EIA-923, 2025.