Geothermal power plant, Nevada

Tungsten Mountain geothermal power plant, Nevada

Tungsten Mountain is a 74.8 MW power plant, 62.5 MW of it geothermal, in Churchill County, Nevada, operated by Tungsten Mountain, and it generated 277,113 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.6% of the generation reported in Nevada, and its capacity factor sits at the 63rd percentile of U.S. geothermal plants. By 2025 generation it ranks 2,072nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.8 MWNameplate capacity
71%Capacity factor, 2025, geothermal units, 63rd percentile, on 41.4 MW net summer
0.6%Of NV generation, 2025
6 yearsAverage generator age, by MW

How hard does the Tungsten Mountain plant run compared with other geothermal plants?

The Tungsten Mountain plant's geothermal units had a capacity factor of 71% in 2025 on 41.4 MW of net summer capacity, the 63rd percentile of the 49 U.S. geothermal plants with at least 20 MW. The typical geothermal plant reached 66%. That equals about 258 days at full output out of 365.

0%Shaded: the middle half of geothermal plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Tungsten Mountain71%
Geothermal plants, 75th percentile81%
Geothermal plants, median66%
Geothermal plants, 25th percentile51%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its geothermal generators only. Values above 105% are left out of the comparison.

Is the Tungsten Mountain plant generating more or less than last year?

Generation at Tungsten Mountain fell 19.1% from 2024 to 2025, from 342,375 MWh to 277,113 MWh. Through August 2026 it is running 2.1% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024342,375
2025277,113
2026 through August185,329
2025, same months181,543
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202617,997
July 202617,818
June 202620,097
May 202623,093
April 202626,148
March 202626,293
February 202625,883
January 202628,000
December 202527,667
November 202526,650
October 202520,001
September 202521,252
August 202520,472
July 202516,060
June 202521,616
May 202512,662
April 202521,355
March 202531,225
February 202528,144
January 202530,009
December 202431,244
November 202430,334
October 202427,074
September 202423,523
August 202422,528
July 202421,122
June 202424,352
May 202430,709
April 202431,849
March 202433,999
February 202431,943
January 202433,698

Source: EIA Form EIA-923, through August 2026.

How much of Nevada's electricity comes from the Tungsten Mountain plant?

Tungsten Mountain made 0.6% of the 45,180,066 MWh reported by Nevada plants in 2025, from 0.4% of the state's 18,959 MW of capacity. Its share of output is 1.6 times its share of capacity. By capacity it is the 51st largest of 117 plants in Nevada, the 3,156th largest of 14,327 in the U.S. and the 15th largest of 66 geothermal plants on its geothermal units alone. By 2025 generation it is the 36th largest of 112 generating plants in the state.

Tungsten Mountain within Nevada, 2025
MeasureThis plantNevadaShare
Capacity (MW)7518,9590.4%
Generation (MWh)277,11345,180,0660.6%
Geothermal capacity (MW)639146.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Tungsten Mountain plant, and when do they retire?

4 operable generators total 74.8 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s24459%none reported
2020s23141%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
UNIT1OperatingGeothermal372017n/a
TMSOLOperatingSolar Photovoltaic72019n/a
OEC2OperatingGeothermal262022n/a
TMSL2OperatingSolar Photovoltaic52023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Tungsten Mountain plant?

EIA lists no joint owners for Tungsten Mountain. Tungsten Mountain operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Tungsten Mountain plant use?

Tungsten Mountain has capacity on 2 fuels: 84% geothermal and 16% solar. In 2025, geothermal made 92% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Geothermal6383.6%256,243
Solar1216.4%20,870

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Tungsten Mountain plant?

Tungsten Mountain is in Fallon, Churchill County, Nevada, at 39.6670° N, 117.6937° W. It sits in the Nevada Power Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which geothermal plants in Nevada are similar in size?

Nevada has 26 operable geothermal plants with 914 MW of capacity, and Tungsten Mountain's 62.5 MW is 7% of that.

Geothermal plants in Nevada around this size
PlantCountyMW2025 MWh
McGinness HillsLander104568,628
McGinness Hills 3Lander99434,362
Dixie ValleyChurchill71422,681
Tungsten MountainChurchill63256,243
Patua Acquisition Project, LLCChurchill4878,035
Stillwater FacilityChurchill4752,598
NGP Blue Mountain I LLCHumboldt45173,108

Source: EIA Forms EIA-860 and EIA-923, 2025.