Skip to main content
RateWatt

Geothermal power plant, Nevada

Patua Acquisition Project, LLC geothermal power plant, Nevada

Patua Acquisition Project, LLC is a 58.6 MW power plant, 48 MW of it geothermal, in Churchill County, Nevada, operated by Patua Acquisition Company, LLC, and it generated 103,345 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Nevada, and its capacity factor sits at the 8th percentile of U.S. geothermal plants. By 2025 generation it ranks 3,357th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

58.6 MWNameplate capacity
30%Capacity factor, 2025, geothermal units, 8th percentile, on 30 MW net summer
0.2%Of NV generation, 2025
11 yearsAverage generator age, by MW

How hard does the Patua Acquisition Project, LLC plant run compared with other geothermal plants?

The Patua Acquisition Project, LLC plant's geothermal units had a capacity factor of 30% in 2025 on 30 MW of net summer capacity, the 8th percentile of the 49 U.S. geothermal plants with at least 20 MW. The typical geothermal plant reached 66%. That equals about 108 days at full output out of 365.

0%Shaded: the middle half of geothermal plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Patua Acquisition Project, LLC30%
Geothermal plants, 75th percentile81%
Geothermal plants, median66%
Geothermal plants, 25th percentile51%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its geothermal generators only. Values above 105% are left out of the comparison.

Is the Patua Acquisition Project, LLC plant generating more or less than last year?

Generation at Patua Acquisition Project, LLC fell 22.6% from 2024 to 2025, from 133,529 MWh to 103,345 MWh.

Net generation by period
PeriodMWh
2024133,529
2025103,345
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202511,214
November 20256,257
October 20255,740
September 20258,200
August 20257,668
July 20255,986
June 20256,752
May 20258,077
April 20258,971
March 202511,935
February 202511,422
January 202511,123
December 202412,786
November 202412,627
October 202411,574
September 202410,745
August 202410,465
July 20249,396
June 202410,240
May 202411,098
April 202411,405
March 202411,262
February 202411,505
January 202410,426

Source: EIA Form EIA-923, through August 2026.

How much of Nevada's electricity comes from the Patua Acquisition Project, LLC plant?

Patua Acquisition Project, LLC made 0.2% of the 45,180,066 MWh reported by Nevada plants in 2025, from 0.3% of the state's 18,959 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 55th largest of 117 plants in Nevada, the 3,578th largest of 14,327 in the U.S. and the 21st largest of 66 geothermal plants on its geothermal units alone. By 2025 generation it is the 57th largest of 112 generating plants in the state.

Patua Acquisition Project, LLC within Nevada, 2025
MeasureThis plantNevadaShare
Capacity (MW)5918,9590.3%
Generation (MWh)103,34545,180,0660.2%
Geothermal capacity (MW)489145.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Patua Acquisition Project, LLC plant, and when do they retire?

4 operable generators total 58.6 MW, with an average age of 11 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s459100%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingGeothermal162013n/a
3OperatingGeothermal162013n/a
5OperatingGeothermal162013n/a
PV-01OperatingSolar Photovoltaic112017n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Patua Acquisition Project, LLC plant?

EIA lists no joint owners for Patua Acquisition Project, LLC. Patua Acquisition Company, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Patua Acquisition Project, LLC plant use?

Patua Acquisition Project, LLC has capacity on 2 fuels: 82% geothermal and 18% solar. In 2025, geothermal made 76% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Geothermal4881.9%78,035
Solar1118.1%25,310

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Patua Acquisition Project, LLC plant?

Patua Acquisition Project, LLC is in Hazen, Churchill County, Nevada, at 39.5858° N, 119.0731° W. It sits in the Nevada Power Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which geothermal plants in Nevada are similar in size?

Nevada has 26 operable geothermal plants with 914 MW of capacity, and Patua Acquisition Project, LLC's 48 MW is 5% of that.

Geothermal plants in Nevada around this size
PlantCountyMW2025 MWh
Dixie ValleyChurchill71422,681
Tungsten MountainChurchill63256,243
Patua Acquisition Project, LLCChurchill4878,035
Stillwater FacilityChurchill4752,598
NGP Blue Mountain I LLCHumboldt45173,108
Tuscarora Geothermal Power PlantElko32119,772

Source: EIA Forms EIA-860 and EIA-923, 2025.