Tuscarora Geothermal Power Plant is a 32 MW geothermal power plant in Elko County, Nevada, operated by Ormat Nevada Inc, and it generated 119,772 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Nevada, and its capacity factor sits at the 43rd percentile of U.S. geothermal plants. By 2025 generation it ranks 3,198th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

32 MWNameplate capacity
64%Capacity factor, 2025, 43rd percentile, on 21.4 MW net summer
0.3%Of NV generation, 2025
13 yearsAverage generator age, by MW

How hard does Tuscarora Geothermal Power Plant run compared with other geothermal plants?

Tuscarora Geothermal Power Plant had a capacity factor of 64% in 2025 on 21.4 MW of net summer capacity, the 43rd percentile of the 49 U.S. geothermal plants with at least 20 MW. The typical geothermal plant reached 66%. That equals about 233 days at full output out of 365.

0%Shaded: the middle half of geothermal plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Tuscarora Geothermal Power Plant64%
Geothermal plants, 75th percentile81%
Geothermal plants, median66%
Geothermal plants, 25th percentile51%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is Tuscarora Geothermal Power Plant generating more or less than last year?

Generation at Tuscarora Geothermal Power Plant fell 3.7% from 2024 to 2025, from 124,415 MWh to 119,772 MWh.

Net generation by period
PeriodMWh
2024124,415
2025119,772
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202510,855
November 202510,453
October 202510,542
September 20259,113
August 20258,144
July 20258,710
June 20258,970
May 20259,947
April 202510,204
March 202511,169
February 202510,132
January 202511,533
December 202411,276
November 202410,965
October 202410,389
September 20249,471
August 20249,091
July 20248,639
June 20248,396
May 202410,624
April 202410,782
March 202411,800
February 202411,116
January 202411,866

Source: EIA Form EIA-923, through August 2026.

How much of Nevada's electricity comes from Tuscarora Geothermal Power Plant?

Tuscarora Geothermal Power Plant made 0.3% of the 45,180,066 MWh reported by Nevada plants in 2025, from 0.2% of the state's 18,959 MW of capacity. Its share of output is 1.6 times its share of capacity. By capacity it is the 65th largest of 117 plants in Nevada, the 4,301st largest of 14,327 in the U.S. and the 33rd largest of 66 geothermal plants. By 2025 generation it is the 51st largest of 112 generating plants in the state.

Tuscarora Geothermal Power Plant within Nevada, 2025
MeasureThis plantNevadaShare
Capacity (MW)3218,9590.2%
Generation (MWh)119,77245,180,0660.3%
Geothermal capacity (MW)329143.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Tuscarora Geothermal Power Plant, and when do they retire?

2 operable generators total 32 MW, with an average age of 13 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s232100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
G9200OperatingGeothermal162012n/a
G9250OperatingGeothermal162012n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Tuscarora Geothermal Power Plant?

EIA lists no joint owners for Tuscarora Geothermal Power Plant. Ormat Nevada Inc operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is Tuscarora Geothermal Power Plant?

Tuscarora Geothermal Power Plant is in Tuscarora, Elko County, Nevada, at 41.4828° N, 116.1511° W. It sits in the Nevada Power Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which geothermal plants in Nevada are similar in size?

Nevada has 26 operable geothermal plants with 914 MW of capacity, and Tuscarora Geothermal Power Plant's 32 MW is 4% of that.

Geothermal plants in Nevada around this size
PlantCountyMW2025 MWh
Patua Acquisition Project, LLCChurchill4878,035
Stillwater FacilityChurchill4752,598
NGP Blue Mountain I LLCHumboldt45173,108
Tuscarora Geothermal Power PlantElko32119,772
Steamboat Hills LPWashoe32233,924
Galena 3 Geothermal Power PlantWashoe3277,854
North ValleyWashoe32196,560

Source: EIA Forms EIA-860 and EIA-923, 2025.