Mesquite Generating Station Block 1 natural gas power plant, Arizona

Mesquite Generating Station Block 1 is a 692 MW natural gas power plant in Maricopa County, Arizona, operated by Salt River Project, and it generated 3,522,461 MWh in 2025 (Forms EIA-860 and EIA-923). That is 3.0% of the generation reported in Arizona, and its capacity factor sits at the 81st percentile of U.S. natural gas plants. By 2025 generation it ranks 333rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

692 MWNameplate capacity
65%Capacity factor, 2025, 81st percentile, on 620 MW net summer
3.0%Of AZ generation, 2025
22 yearsAverage generator age, by MW

How hard does the Mesquite Generating Station Block 1 plant run compared with other natural gas plants?

The Mesquite Generating Station Block 1 plant had a capacity factor of 65% in 2025 on 620 MW of net summer capacity, the 81st percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 237 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Mesquite Generating Station Block 165%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Mesquite Generating Station Block 1 plant generating more or less than last year?

Generation at Mesquite Generating Station Block 1 fell 1.6% from 2024 to 2025, from 3,581,057 MWh to 3,522,461 MWh. Through August 2026 it is running 22.7% behind the same months of 2025.

2 months show net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.

Net generation by period
PeriodMWh
20243,581,057
20253,522,461
2026 through August1,749,311
2025, same months2,264,435
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026349,586
July 2026377,212
June 2026293,593
May 2026287,514
April 2026228,127
March 2026213,848
February 2026-294
January 2026-275
December 2025356,737
November 2025372,275
October 2025177,531
September 2025351,483
August 2025374,224
July 2025336,516
June 2025310,313
May 2025297,981
April 2025267,474
March 2025115,579
February 2025241,738
January 2025320,610
December 2024380,203
November 2024201,884
October 2024365,038
September 2024359,800
August 2024388,127
July 2024374,490
June 2024243,793
May 2024277,095
April 2024279,120
March 2024272,868
February 2024106,050
January 2024332,589

Source: EIA Form EIA-923, through August 2026.

How much of Arizona's electricity comes from the Mesquite Generating Station Block 1 plant?

Mesquite Generating Station Block 1 made 3.0% of the 115,800,378 MWh reported by Arizona plants in 2025, from 1.7% of the state's 40,514 MW of capacity. Its share of output is 1.8 times its share of capacity. By capacity it is the 19th largest of 191 plants in Arizona, the 501st largest of 14,327 in the U.S. and the 295th largest of 1,962 natural gas plants. By 2025 generation it is the 8th largest of 167 generating plants in the state.

Mesquite Generating Station Block 1 within Arizona, 2025
MeasureThis plantArizonaShare
Capacity (MW)69240,5141.7%
Generation (MWh)3,522,461115,800,3783.0%
Natural gas capacity (MW)69217,3864.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Mesquite Generating Station Block 1 plant, and when do they retire?

3 operable generators total 692 MW, with an average age of 22 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s3692100%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GT1OperatingNatural Gas Fired Combined Cycle1852003n/a
GT2OperatingNatural Gas Fired Combined Cycle1852003n/a
ST1OperatingNatural Gas Fired Combined Cycle3212003n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Mesquite Generating Station Block 1 plant?

EIA lists no joint owners for Mesquite Generating Station Block 1. Salt River Project operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Salt River Project charge homes?

Salt River Project, the operator of Mesquite Generating Station Block 1, had an average residential price of 13.98¢ per kWh and an average bill of $160 a month in 2025, 8% below the Arizona average of 15.26¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Arizona
Salt River Project13.98¢$1608% lower
Arizona average15.26¢$157
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Mesquite Generating Station Block 1 plant?

Mesquite Generating Station Block 1 is in Arlington, Maricopa County, Arizona, at 33.3450° N, 112.8642° W. It sits in the Salt River Project balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Arizona are similar in size?

Arizona has 33 operable natural gas plants with 17,386 MW of capacity, and Mesquite Generating Station Block 1's 692 MW is 4% of that.

Natural gas plants in Arizona around this size
PlantCountyMW2025 MWh
South Point Energy CenterMohave7082,024,909
SundancePinal695313,093
Mesquite Generating Station Block 2Maricopa6923,951,425
Mesquite Generating Station Block 1Maricopa6923,522,461
Griffith Energy LLCMohave6553,781,278
Gila River Power Block 4Maricopa6192,671,230
Gila River Power Block 1Maricopa6192,561,038

Source: EIA Forms EIA-860 and EIA-923, 2025.