Natural gas power plant, Arizona
Mesquite Generating Station Block 2 natural gas power plant, Arizona
Mesquite Generating Station Block 2 is a 692 MW natural gas power plant in Maricopa County, Arizona, operated by Mesquite Power LLC, and it generated 3,951,425 MWh in 2025 (Forms EIA-860 and EIA-923). That is 3.4% of the generation reported in Arizona, and its capacity factor sits at the 87th percentile of U.S. natural gas plants. By 2025 generation it ranks 292nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Mesquite Generating Station Block 2 plant run compared with other natural gas plants?
The Mesquite Generating Station Block 2 plant had a capacity factor of 72% in 2025 on 624 MW of net summer capacity, the 87th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 264 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Mesquite Generating Station Block 2 | 72% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Mesquite Generating Station Block 2 plant generating more or less than last year?
Mesquite Generating Station Block 2 generated 3,951,425 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 6.5% behind the same months of 2025. 2024 has output for only 11 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 3,418,526 |
| 2025 | 3,951,425 |
| 2026 through August | 2,497,419 |
| 2025, same months | 2,671,956 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 396,128 |
| July 2026 | 414,349 |
| June 2026 | 354,369 |
| May 2026 | 320,113 |
| April 2026 | 301,200 |
| March 2026 | 299,031 |
| February 2026 | 121,487 |
| January 2026 | 290,742 |
| December 2025 | 340,673 |
| November 2025 | 184,976 |
| October 2025 | 363,175 |
| September 2025 | 390,645 |
| August 2025 | 412,295 |
| July 2025 | 403,039 |
| June 2025 | 372,833 |
| May 2025 | 333,997 |
| April 2025 | 312,948 |
| March 2025 | 207,587 |
| February 2025 | 258,533 |
| January 2025 | 370,724 |
| December 2024 | 378,447 |
| November 2024 | 275,521 |
| October 2024 | 408,200 |
| September 2024 | 398,722 |
| August 2024 | 423,335 |
| July 2024 | 407,400 |
| June 2024 | 377,541 |
| May 2024 | 311,892 |
| April 2024 | 262,435 |
| March 2024 | 143,530 |
| February 2024 | 0 |
| January 2024 | 31,503 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Mesquite Generating Station Block 2 plant, and when do they retire?
3 operable generators total 692 MW, with an average age of 22 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 3 | 692 | 100% | none reported |
Every generator, 3 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GT3 | Operating | Natural Gas Fired Combined Cycle | 185 | 2003 | n/a |
| GT4 | Operating | Natural Gas Fired Combined Cycle | 185 | 2003 | n/a |
| ST2 | Operating | Natural Gas Fired Combined Cycle | 321 | 2003 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Mesquite Generating Station Block 2 plant?
EIA lists no joint owners for Mesquite Generating Station Block 2. Mesquite Power LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Mesquite Generating Station Block 2 plant?
Mesquite Generating Station Block 2 is in Arlington, Maricopa County, Arizona, at 33.3450° N, 112.8642° W. It sits in the Salt River Project balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in Arizona are similar in size?
Arizona has 33 operable natural gas plants with 17,386 MW of capacity, and Mesquite Generating Station Block 2's 692 MW is 4% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Agua Fria | Maricopa | 712 | 247,148 |
| South Point Energy Center | Mohave | 708 | 2,024,909 |
| Sundance | Pinal | 695 | 313,093 |
| Mesquite Generating Station Block 2 | Maricopa | 692 | 3,951,425 |
| Mesquite Generating Station Block 1 | Maricopa | 692 | 3,522,461 |
| Griffith Energy LLC | Mohave | 655 | 3,781,278 |
| Gila River Power Block 4 | Maricopa | 619 | 2,671,230 |
Source: EIA Forms EIA-860 and EIA-923, 2025.