Natural gas power plant, Arizona

Mesquite Generating Station Block 2 natural gas power plant, Arizona

Mesquite Generating Station Block 2 is a 692 MW natural gas power plant in Maricopa County, Arizona, operated by Mesquite Power LLC, and it generated 3,951,425 MWh in 2025 (Forms EIA-860 and EIA-923). That is 3.4% of the generation reported in Arizona, and its capacity factor sits at the 87th percentile of U.S. natural gas plants. By 2025 generation it ranks 292nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

692 MWNameplate capacity
72%Capacity factor, 2025, 87th percentile, on 624 MW net summer
3.4%Of AZ generation, 2025
22 yearsAverage generator age, by MW

How hard does the Mesquite Generating Station Block 2 plant run compared with other natural gas plants?

The Mesquite Generating Station Block 2 plant had a capacity factor of 72% in 2025 on 624 MW of net summer capacity, the 87th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 264 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Mesquite Generating Station Block 272%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Mesquite Generating Station Block 2 plant generating more or less than last year?

Mesquite Generating Station Block 2 generated 3,951,425 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 6.5% behind the same months of 2025. 2024 has output for only 11 months, so the two years are not compared.

Net generation by period
PeriodMWh
20243,418,526
20253,951,425
2026 through August2,497,419
2025, same months2,671,956
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026396,128
July 2026414,349
June 2026354,369
May 2026320,113
April 2026301,200
March 2026299,031
February 2026121,487
January 2026290,742
December 2025340,673
November 2025184,976
October 2025363,175
September 2025390,645
August 2025412,295
July 2025403,039
June 2025372,833
May 2025333,997
April 2025312,948
March 2025207,587
February 2025258,533
January 2025370,724
December 2024378,447
November 2024275,521
October 2024408,200
September 2024398,722
August 2024423,335
July 2024407,400
June 2024377,541
May 2024311,892
April 2024262,435
March 2024143,530
February 20240
January 202431,503

Source: EIA Form EIA-923, through August 2026.

How much of Arizona's electricity comes from the Mesquite Generating Station Block 2 plant?

Mesquite Generating Station Block 2 made 3.4% of the 115,800,378 MWh reported by Arizona plants in 2025, from 1.7% of the state's 40,514 MW of capacity. Its share of output is 2.0 times its share of capacity. By capacity it is the 19th largest of 191 plants in Arizona, the 501st largest of 14,327 in the U.S. and the 294th largest of 1,962 natural gas plants. By 2025 generation it is the 6th largest of 167 generating plants in the state.

Mesquite Generating Station Block 2 within Arizona, 2025
MeasureThis plantArizonaShare
Capacity (MW)69240,5141.7%
Generation (MWh)3,951,425115,800,3783.4%
Natural gas capacity (MW)69217,3864.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Mesquite Generating Station Block 2 plant, and when do they retire?

3 operable generators total 692 MW, with an average age of 22 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s3692100%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GT3OperatingNatural Gas Fired Combined Cycle1852003n/a
GT4OperatingNatural Gas Fired Combined Cycle1852003n/a
ST2OperatingNatural Gas Fired Combined Cycle3212003n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Mesquite Generating Station Block 2 plant?

EIA lists no joint owners for Mesquite Generating Station Block 2. Mesquite Power LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Mesquite Generating Station Block 2 plant?

Mesquite Generating Station Block 2 is in Arlington, Maricopa County, Arizona, at 33.3450° N, 112.8642° W. It sits in the Salt River Project balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Arizona are similar in size?

Arizona has 33 operable natural gas plants with 17,386 MW of capacity, and Mesquite Generating Station Block 2's 692 MW is 4% of that.

Natural gas plants in Arizona around this size
PlantCountyMW2025 MWh
Agua FriaMaricopa712247,148
South Point Energy CenterMohave7082,024,909
SundancePinal695313,093
Mesquite Generating Station Block 2Maricopa6923,951,425
Mesquite Generating Station Block 1Maricopa6923,522,461
Griffith Energy LLCMohave6553,781,278
Gila River Power Block 4Maricopa6192,671,230

Source: EIA Forms EIA-860 and EIA-923, 2025.