Solar power plant, Arizona
Mesquite Solar 1 power plant, Arizona
Mesquite Solar 1 is a 170 MW solar power plant in Maricopa County, Arizona, operated by RWE Clean Energy, and it generated 392,193 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Arizona, and its capacity factor sits at the 73rd percentile of U.S. solar plants. By 2025 generation it ranks 1,612th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Mesquite Solar 1 plant run compared with other solar plants?
The Mesquite Solar 1 plant had a capacity factor of 26% in 2025 on 170 MW of net summer capacity, the 73rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 96 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Mesquite Solar 1 | 26% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Mesquite Solar 1 plant generating more or less than last year?
Generation at Mesquite Solar 1 fell 2.3% from 2024 to 2025, from 401,380 MWh to 392,193 MWh.
| Period | MWh |
|---|---|
| 2024 | 401,380 |
| 2025 | 392,193 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 22,898 |
| November 2025 | 25,197 |
| October 2025 | 32,707 |
| September 2025 | 32,505 |
| August 2025 | 36,014 |
| July 2025 | 37,456 |
| June 2025 | 37,938 |
| May 2025 | 38,529 |
| April 2025 | 37,832 |
| March 2025 | 34,793 |
| February 2025 | 29,201 |
| January 2025 | 27,123 |
| December 2024 | 23,734 |
| November 2024 | 28,466 |
| October 2024 | 34,509 |
| September 2024 | 35,756 |
| August 2024 | 36,059 |
| July 2024 | 36,719 |
| June 2024 | 37,194 |
| May 2024 | 41,497 |
| April 2024 | 39,609 |
| March 2024 | 35,655 |
| February 2024 | 28,214 |
| January 2024 | 23,968 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Mesquite Solar 1 plant, and when do they retire?
12 operable generators total 170 MW, with an average age of 13 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 12 | 170 | 100% | none reported |
Every generator, 12 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Solar Photovoltaic | 16 | 2011 | n/a |
| 3 | Operating | Solar Photovoltaic | 10 | 2011 | n/a |
| 2 | Operating | Solar Photovoltaic | 16 | 2012 | n/a |
| 4 | Operating | Solar Photovoltaic | 16 | 2012 | n/a |
| 5 | Operating | Solar Photovoltaic | 16 | 2012 | n/a |
| 6 | Operating | Solar Photovoltaic | 8 | 2012 | n/a |
| 7 | Operating | Solar Photovoltaic | 16 | 2012 | n/a |
| 8 | Operating | Solar Photovoltaic | 12 | 2012 | n/a |
| 9 | Operating | Solar Photovoltaic | 16 | 2012 | n/a |
| 10 | Operating | Solar Photovoltaic | 12 | 2012 | n/a |
| 11 | Operating | Solar Photovoltaic | 16 | 2012 | n/a |
| 12 | Operating | Solar Photovoltaic | 16 | 2012 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Mesquite Solar 1 plant?
EIA lists no joint owners for Mesquite Solar 1. RWE Clean Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Mesquite Solar 1 plant?
Mesquite Solar 1 is in Tonopah, Maricopa County, Arizona, at 33.3418° N, 112.9040° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Arizona are similar in size?
Arizona has 111 operable solar plants with 6,672 MW of capacity, and Mesquite Solar 1's 170 MW is 3% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| McFarland A Solar and Storage | Yuma | 200 | 550,669 |
| Brittlebush Solar | Pinal | 200 | 562,100 |
| White Wing Solar | Yuma | 179 | 453,960 |
| Mesquite Solar 1 | Maricopa | 170 | 392,193 |
| Sun Streams, LLC | Maricopa | 160 | 411,702 |
| Mesquite Solar 3, LLC | Maricopa | 150 | 443,395 |
| Sun Streams 2 | Maricopa | 150 | 328,214 |
Source: EIA Forms EIA-860 and EIA-923, 2025.