Natural gas power plant, Wisconsin

MMSD Jones Island Wastewater natural gas power plant, Wisconsin

MMSD Jones Island Wastewater is a 31.3 MW power plant, 22.1 MW of it natural gas, in Milwaukee County, Wisconsin, operated by Milwaukee Metro Sewerage Dist, and it generated 79,791 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Wisconsin, and its capacity factor sits at the 65th percentile of U.S. natural gas plants. By 2025 generation it ranks 3,645th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

31.3 MWNameplate capacity
42%Capacity factor, 2025, natural gas units, 65th percentile, on 17.6 MW net summer
0.1%Of WI generation, 2025
35 yearsAverage generator age, by MW

How hard does the MMSD Jones Island Wastewater plant run compared with other natural gas plants?

The MMSD Jones Island Wastewater plant's natural gas units had a capacity factor of 42% in 2025 on 17.6 MW of net summer capacity, the 65th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 152 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
MMSD Jones Island Wastewater42%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its natural gas generators only. Values above 105% are left out of the comparison.

Is the MMSD Jones Island Wastewater plant generating more or less than last year?

Generation at MMSD Jones Island Wastewater rose 44.6% from 2024 to 2025, from 55,165 MWh to 79,791 MWh. Through August 2026 it is running 4.8% ahead of the same months of 2025.

Net generation by period
PeriodMWh
202455,165
202579,791
2026 through August55,037
2025, same months52,539
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20266,357
July 20265,317
June 20267,141
May 20266,025
April 202610,251
March 20267,152
February 20265,746
January 20267,048
December 20257,846
November 20256,526
October 20256,188
September 20256,692
August 20257,234
July 20256,222
June 20256,373
May 20257,197
April 20256,931
March 20257,628
February 20256,384
January 20254,570
December 20243,572
November 20246,373
October 20244,934
September 20245,576
August 20244,912
July 20244,244
June 20243,985
May 20244,577
April 20241,954
March 20244,795
February 20245,199
January 20245,044

Source: EIA Form EIA-923, through August 2026.

How much of Wisconsin's electricity comes from the MMSD Jones Island Wastewater plant?

MMSD Jones Island Wastewater made 0.1% of the 66,249,756 MWh reported by Wisconsin plants in 2025, from 0.2% of the state's 19,442 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 76th largest of 273 plants in Wisconsin, the 4,324th largest of 14,327 in the U.S. and the 1,270th largest of 1,962 natural gas plants on its natural gas units alone. By 2025 generation it is the 67th largest of 259 generating plants in the state.

MMSD Jones Island Wastewater within Wisconsin, 2025
MeasureThis plantWisconsinShare
Capacity (MW)3119,4420.2%
Generation (MWh)79,79166,249,7560.1%
Natural gas capacity (MW)227,8240.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the MMSD Jones Island Wastewater plant, and when do they retire?

4 operable generators total 31.3 MW, with an average age of 35 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 has already retired, totalling 17.5 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1970s11856%none reported
2010s31444%none reported
Every generator, 5 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingNatural Gas Fired Combustion Turbine181971n/a
SOL1OperatingNatural Gas Fired Combustion Turbine52013n/a
SOL2OperatingLandfill Gas52013n/a
SOL3OperatingLandfill Gas52013n/a
GEN2RetiredNatural Gas Fired Combustion Turbine1819712013

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the MMSD Jones Island Wastewater plant?

EIA lists no joint owners for MMSD Jones Island Wastewater. Milwaukee Metro Sewerage Dist operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the MMSD Jones Island Wastewater plant use?

MMSD Jones Island Wastewater has capacity on 2 fuels: 71% natural gas and 29% biomass. In 2025, natural gas made 80% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Natural gas2270.6%64,146
Biomass929.4%14,716

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the MMSD Jones Island Wastewater plant?

MMSD Jones Island Wastewater is in Milwaukee, Milwaukee County, Wisconsin, at 43.0214° N, 87.9014° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Wisconsin are similar in size?

Wisconsin has 38 operable natural gas plants with 7,824 MW of capacity, and MMSD Jones Island Wastewater's 22.1 MW is 0% of that.

Natural gas plants in Wisconsin around this size
PlantCountyMW2025 MWh
Sycamore (WI)Dane4228
Custer Energy CenterManitowoc254,101
MMSD Jones Island WastewaterMilwaukee2264,146
Georgia-Pacific Corp - Nekoosa MillWood2275,973
Kaukauna Gas TurbineOutagamie182,340
Nine SpringsDane1689

Source: EIA Forms EIA-860 and EIA-923, 2025.