Natural gas power plant, Wisconsin
MMSD Jones Island Wastewater natural gas power plant, Wisconsin
MMSD Jones Island Wastewater is a 31.3 MW power plant, 22.1 MW of it natural gas, in Milwaukee County, Wisconsin, operated by Milwaukee Metro Sewerage Dist, and it generated 79,791 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Wisconsin, and its capacity factor sits at the 65th percentile of U.S. natural gas plants. By 2025 generation it ranks 3,645th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the MMSD Jones Island Wastewater plant run compared with other natural gas plants?
The MMSD Jones Island Wastewater plant's natural gas units had a capacity factor of 42% in 2025 on 17.6 MW of net summer capacity, the 65th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 152 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| MMSD Jones Island Wastewater | 42% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its natural gas generators only. Values above 105% are left out of the comparison.
Is the MMSD Jones Island Wastewater plant generating more or less than last year?
Generation at MMSD Jones Island Wastewater rose 44.6% from 2024 to 2025, from 55,165 MWh to 79,791 MWh. Through August 2026 it is running 4.8% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 55,165 |
| 2025 | 79,791 |
| 2026 through August | 55,037 |
| 2025, same months | 52,539 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 6,357 |
| July 2026 | 5,317 |
| June 2026 | 7,141 |
| May 2026 | 6,025 |
| April 2026 | 10,251 |
| March 2026 | 7,152 |
| February 2026 | 5,746 |
| January 2026 | 7,048 |
| December 2025 | 7,846 |
| November 2025 | 6,526 |
| October 2025 | 6,188 |
| September 2025 | 6,692 |
| August 2025 | 7,234 |
| July 2025 | 6,222 |
| June 2025 | 6,373 |
| May 2025 | 7,197 |
| April 2025 | 6,931 |
| March 2025 | 7,628 |
| February 2025 | 6,384 |
| January 2025 | 4,570 |
| December 2024 | 3,572 |
| November 2024 | 6,373 |
| October 2024 | 4,934 |
| September 2024 | 5,576 |
| August 2024 | 4,912 |
| July 2024 | 4,244 |
| June 2024 | 3,985 |
| May 2024 | 4,577 |
| April 2024 | 1,954 |
| March 2024 | 4,795 |
| February 2024 | 5,199 |
| January 2024 | 5,044 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the MMSD Jones Island Wastewater plant, and when do they retire?
4 operable generators total 31.3 MW, with an average age of 35 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 has already retired, totalling 17.5 MW.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1970s | 1 | 18 | 56% | none reported |
| 2010s | 3 | 14 | 44% | none reported |
Every generator, 5 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GEN1 | Operating | Natural Gas Fired Combustion Turbine | 18 | 1971 | n/a |
| SOL1 | Operating | Natural Gas Fired Combustion Turbine | 5 | 2013 | n/a |
| SOL2 | Operating | Landfill Gas | 5 | 2013 | n/a |
| SOL3 | Operating | Landfill Gas | 5 | 2013 | n/a |
| GEN2 | Retired | Natural Gas Fired Combustion Turbine | 18 | 1971 | 2013 |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the MMSD Jones Island Wastewater plant?
EIA lists no joint owners for MMSD Jones Island Wastewater. Milwaukee Metro Sewerage Dist operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the MMSD Jones Island Wastewater plant use?
MMSD Jones Island Wastewater has capacity on 2 fuels: 71% natural gas and 29% biomass. In 2025, natural gas made 80% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Natural gas | 22 | 70.6% | 64,146 |
| Biomass | 9 | 29.4% | 14,716 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the MMSD Jones Island Wastewater plant?
MMSD Jones Island Wastewater is in Milwaukee, Milwaukee County, Wisconsin, at 43.0214° N, 87.9014° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in Wisconsin are similar in size?
Wisconsin has 38 operable natural gas plants with 7,824 MW of capacity, and MMSD Jones Island Wastewater's 22.1 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Sycamore (WI) | Dane | 42 | 28 |
| Custer Energy Center | Manitowoc | 25 | 4,101 |
| MMSD Jones Island Wastewater | Milwaukee | 22 | 64,146 |
| Georgia-Pacific Corp - Nekoosa Mill | Wood | 22 | 75,973 |
| Kaukauna Gas Turbine | Outagamie | 18 | 2,340 |
| Nine Springs | Dane | 16 | 89 |