Hydro power plant, North Carolina
Narrows hydroelectric power plant, North Carolina
Narrows (NC) is a 109 MW hydro power plant in Stanly County, North Carolina, operated by Eagle Creek Renewable Energy, LLC, and it generated 362,757 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in North Carolina, and its capacity factor sits at the 54th percentile of U.S. hydro plants. By 2025 generation it ranks 1,721st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Narrows (NC) plant run compared with other hydro plants?
The Narrows (NC) plant had a capacity factor of 35% in 2025 on 119 MW of net summer capacity, the 54th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 127 days at full output out of 365.
0%Shaded: the middle half of hydro plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Narrows (NC) | 35% |
| Hydro plants, 75th percentile | 44% |
| Hydro plants, median | 33% |
| Hydro plants, 25th percentile | 22% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Narrows (NC) plant generating more or less than last year?
Generation at Narrows (NC) fell 25.6% from 2024 to 2025, from 487,543 MWh to 362,757 MWh.
| Period | MWh |
|---|---|
| 2024 | 487,543 |
| 2025 | 362,757 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 16,148 |
| November 2025 | 17,109 |
| October 2025 | 17,153 |
| September 2025 | 18,165 |
| August 2025 | 28,165 |
| July 2025 | 37,609 |
| June 2025 | 41,239 |
| May 2025 | 42,937 |
| April 2025 | 35,333 |
| March 2025 | 21,522 |
| February 2025 | 47,819 |
| January 2025 | 39,558 |
| December 2024 | 37,181 |
| November 2024 | 21,341 |
| October 2024 | 39,130 |
| September 2024 | 33,132 |
| August 2024 | 40,078 |
| July 2024 | 17,496 |
| June 2024 | 23,624 |
| May 2024 | 51,035 |
| April 2024 | 40,379 |
| March 2024 | 63,267 |
| February 2024 | 54,441 |
| January 2024 | 66,439 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Narrows (NC) plant, and when do they retire?
4 operable generators total 109 MW, with an average age of 106 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1910s | 3 | 78 | 72% | none reported |
| 1920s | 1 | 30 | 28% | none reported |
Every generator, 4 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| YN1 | Operating | Conventional Hydroelectric | 25 | 1917 | n/a |
| YN2 | Operating | Conventional Hydroelectric | 25 | 1917 | n/a |
| YN3 | Operating | Conventional Hydroelectric | 29 | 1917 | n/a |
| YN4 | Operating | Conventional Hydroelectric | 30 | 1924 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Narrows (NC) plant?
Cube Yadkin Generation LLC is the only joint owner reported for Narrows (NC), with 100.0%. Eagle Creek Renewable Energy, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Narrows (NC) plant?
Narrows (NC) is in Badin, Stanly County, North Carolina, at 35.4189° N, 80.0917° W. It sits in the Alcoa Power Generating, Inc. - Yadkin Division balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which hydro plants in North Carolina are similar in size?
North Carolina has 37 operable hydro plants with 1,792 MW of capacity, and Narrows (NC)'s 109 MW is 6% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Gaston | Halifax | 178 | 225,599 |
| Cheoah | Graham | 140 | 472,350 |
| Narrows (NC) | Stanly | 109 | 362,757 |
| Walters | Haywood | 108 | 289,085 |
| Roanoke Rapids | Halifax | 100 | 187,211 |
| Tillery | Montgomery | 84 | 117,676 |
Source: EIA Forms EIA-860 and EIA-923, 2025.