Hydro power plant, North Carolina

Tillery hydroelectric power plant, North Carolina

Tillery is a 84 MW hydro power plant in Montgomery County, North Carolina, operated by Duke Energy Progress-(NC), and it generated 117,676 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in North Carolina, and its capacity factor sits at the 12th percentile of U.S. hydro plants. By 2025 generation it ranks 3,227th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

84 MWNameplate capacity
16%Capacity factor, 2025, 12th percentile, on 85 MW net summer
0.1%Of NC generation, 2025
89 yearsAverage generator age, by MW

How hard does the Tillery plant run compared with other hydro plants?

The Tillery plant had a capacity factor of 16% in 2025 on 85 MW of net summer capacity, the 12th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 58 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Tillery16%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Tillery plant generating more or less than last year?

Generation at Tillery fell 36.1% from 2024 to 2025, from 184,248 MWh to 117,676 MWh.

Net generation by period
PeriodMWh
2024184,248
2025117,676
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20254,284
November 20254,305
October 20254,169
September 20254,304
August 20259,393
July 202512,176
June 202513,830
May 202513,795
April 202511,423
March 20257,233
February 202519,372
January 202513,392
December 202412,945
November 20246,389
October 202413,393
September 202411,234
August 202415,321
July 20244,950
June 20246,490
May 202419,305
April 202414,157
March 202426,923
February 202421,608
January 202431,533

Source: EIA Form EIA-923, through August 2026.

How much of North Carolina's electricity comes from the Tillery plant?

Tillery made 0.1% of the 134,194,434 MWh reported by North Carolina plants in 2025, from 0.2% of the state's 39,933 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 46th largest of 928 plants in North Carolina, the 2,917th largest of 14,327 in the U.S. and the 184th largest of 1,393 hydro plants. By 2025 generation it is the 63rd largest of 872 generating plants in the state.

Tillery within North Carolina, 2025
MeasureThis plantNorth CarolinaShare
Capacity (MW)8439,9330.2%
Generation (MWh)117,676134,194,4340.1%
Hydro capacity (MW)841,7924.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Tillery plant, and when do they retire?

4 operable generators total 84 MW, with an average age of 89 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1920s36274%none reported
1960s12226%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingConventional Hydroelectric221928n/a
2OperatingConventional Hydroelectric181928n/a
3OperatingConventional Hydroelectric221928n/a
4OperatingConventional Hydroelectric221960n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Tillery plant?

EIA lists no joint owners for Tillery. Duke Energy Progress-(NC) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Duke Energy Progress charge homes?

Duke Energy Progress, the operator of Tillery, had an average residential price of 15.19¢ per kWh and an average bill of $159 a month in 2025, 9% above the North Carolina average of 14.00¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst North Carolina
Duke Energy Progress15.19¢$1599% higher
North Carolina average14.00¢$146
U.S. average17.23¢$15123% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Tillery plant?

Tillery is in Mount Gilead, Montgomery County, North Carolina, at 35.2067° N, 80.0648° W. It sits in the Duke Energy Progress East balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in North Carolina are similar in size?

North Carolina has 37 operable hydro plants with 1,792 MW of capacity, and Tillery's 84 MW is 5% of that.

Hydro plants in North Carolina around this size
PlantCountyMW2025 MWh
Narrows (NC)Stanly109362,757
WaltersHaywood108289,085
Roanoke RapidsHalifax100187,211
TilleryMontgomery84117,676
Mountain IslandGaston6089,991
SanteetlahGraham45129,968
NantahalaMacon43188,393

Source: EIA Forms EIA-860 and EIA-923, 2025.