Wind power plant, California
North Sky River Energy LLC wind power plant, California
North Sky River Energy LLC is a 162 MW wind power plant in Kern County, California, operated by North Sky River Energy LLC, and it generated 364,773 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 24th percentile of U.S. wind plants. By 2025 generation it ranks 1,713th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the North Sky River Energy LLC plant run compared with other wind plants?
The North Sky River Energy LLC plant had a capacity factor of 26% in 2025 on 162 MW of net summer capacity, the 24th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 94 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| North Sky River Energy LLC | 26% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the North Sky River Energy LLC plant generating more or less than last year?
Generation at North Sky River Energy LLC fell 16.2% from 2024 to 2025, from 435,045 MWh to 364,773 MWh.
| Period | MWh |
|---|---|
| 2024 | 435,045 |
| 2025 | 364,773 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 17,249 |
| November 2025 | 16,427 |
| October 2025 | 24,363 |
| September 2025 | 27,410 |
| August 2025 | 39,080 |
| July 2025 | 44,550 |
| June 2025 | 45,207 |
| May 2025 | 33,379 |
| April 2025 | 33,379 |
| March 2025 | 38,825 |
| February 2025 | 24,361 |
| January 2025 | 20,543 |
| December 2024 | 24,263 |
| November 2024 | 25,397 |
| October 2024 | 24,312 |
| September 2024 | 28,459 |
| August 2024 | 43,253 |
| July 2024 | 37,015 |
| June 2024 | 55,191 |
| May 2024 | 52,431 |
| April 2024 | 44,361 |
| March 2024 | 44,710 |
| February 2024 | 22,846 |
| January 2024 | 32,807 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the North Sky River Energy LLC plant, and when do they retire?
1 operable generator totals 162 MW, with an average age of 13 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 162 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GEN1 | Operating | Onshore Wind Turbine | 162 | 2012 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the North Sky River Energy LLC plant?
EIA lists no joint owners for North Sky River Energy LLC. North Sky River Energy LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the North Sky River Energy LLC plant?
North Sky River Energy LLC is in Weldon, Kern County, California, at 35.3478° N, 118.1864° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in California are similar in size?
California has 111 operable wind plants with 6,479 MW of capacity, and North Sky River Energy LLC's 162 MW is 3% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Alta Wind Energy Center V | Kern | 168 | 253,696 |
| Pinyon Pine I | Kern | 168 | 283,077 |
| High Winds LLC | Solano | 162 | 214,310 |
| North Sky River Energy LLC | Kern | 162 | 364,773 |
| Pacific Wind LLC | Kern | 152 | 294,749 |
| Shiloh I Wind Project | Solano | 150 | 399,952 |
| Shiloh Wind Project 2 LLC | Solano | 150 | 368,967 |
Source: EIA Forms EIA-860 and EIA-923, 2025.