Wind power plant, California
Shiloh I Wind Project, California
Shiloh I Wind Project is a 150 MW wind power plant in Solano County, California, operated by Avangrid Power LLC, and it generated 399,952 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 41st percentile of U.S. wind plants. By 2025 generation it ranks 1,588th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Shiloh I Wind Project plant run compared with other wind plants?
The Shiloh I Wind Project plant had a capacity factor of 30% in 2025 on 150 MW of net summer capacity, the 41st percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 111 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Shiloh I Wind Project | 30% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Shiloh I Wind Project plant generating more or less than last year?
Generation at Shiloh I Wind Project rose 2.7% from 2024 to 2025, from 389,607 MWh to 399,952 MWh.
| Period | MWh |
|---|---|
| 2024 | 389,607 |
| 2025 | 399,952 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 8,929 |
| November 2025 | 8,024 |
| October 2025 | 17,496 |
| September 2025 | 36,492 |
| August 2025 | 61,342 |
| July 2025 | 74,495 |
| June 2025 | 69,746 |
| May 2025 | 40,574 |
| April 2025 | 26,260 |
| March 2025 | 23,901 |
| February 2025 | 16,267 |
| January 2025 | 16,426 |
| December 2024 | 7,931 |
| November 2024 | 16,977 |
| October 2024 | 21,095 |
| September 2024 | 41,803 |
| August 2024 | 53,390 |
| July 2024 | 58,584 |
| June 2024 | 53,206 |
| May 2024 | 53,822 |
| April 2024 | 28,615 |
| March 2024 | 28,563 |
| February 2024 | 15,155 |
| January 2024 | 10,466 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Shiloh I Wind Project plant, and when do they retire?
1 operable generator totals 150 MW, with an average age of 19 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 1 | 150 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Onshore Wind Turbine | 150 | 2006 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Shiloh I Wind Project plant?
EIA lists no joint owners for Shiloh I Wind Project. Avangrid Power LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Shiloh I Wind Project plant?
Shiloh I Wind Project is in Rio Vista, Solano County, California, at 38.1200° N, 121.8500° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in California are similar in size?
California has 111 operable wind plants with 6,479 MW of capacity, and Shiloh I Wind Project's 150 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| High Winds LLC | Solano | 162 | 214,310 |
| North Sky River Energy LLC | Kern | 162 | 364,773 |
| Pacific Wind LLC | Kern | 152 | 294,749 |
| Shiloh I Wind Project | Solano | 150 | 399,952 |
| Shiloh Wind Project 2 LLC | Solano | 150 | 368,967 |
| Alta Wind Energy Center I | Kern | 150 | 399,786 |
| Alta Wind Energy Center II | Kern | 150 | 318,266 |
Source: EIA Forms EIA-860 and EIA-923, 2025.