Wind power plant, California
Shiloh Wind Project 2 LLC power plant, California
Shiloh Wind Project 2 LLC is a 150 MW wind power plant in Solano County, California, operated by EDF Renewable Asset Holdings, Inc., and it generated 368,967 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 32nd percentile of U.S. wind plants. By 2025 generation it ranks 1,694th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Shiloh Wind Project 2 LLC plant run compared with other wind plants?
The Shiloh Wind Project 2 LLC plant had a capacity factor of 28% in 2025 on 150 MW of net summer capacity, the 32nd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 102 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Shiloh Wind Project 2 LLC | 28% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Shiloh Wind Project 2 LLC plant generating more or less than last year?
Generation at Shiloh Wind Project 2 LLC fell 6.1% from 2024 to 2025, from 393,051 MWh to 368,967 MWh.
| Period | MWh |
|---|---|
| 2024 | 393,051 |
| 2025 | 368,967 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 9,799 |
| November 2025 | 6,214 |
| October 2025 | 15,867 |
| September 2025 | 35,201 |
| August 2025 | 61,718 |
| July 2025 | 73,554 |
| June 2025 | 64,298 |
| May 2025 | 33,110 |
| April 2025 | 22,354 |
| March 2025 | 18,640 |
| February 2025 | 15,852 |
| January 2025 | 12,360 |
| December 2024 | 9,441 |
| November 2024 | 16,745 |
| October 2024 | 20,038 |
| September 2024 | 40,296 |
| August 2024 | 53,643 |
| July 2024 | 58,438 |
| June 2024 | 53,343 |
| May 2024 | 56,122 |
| April 2024 | 28,491 |
| March 2024 | 27,937 |
| February 2024 | 16,430 |
| January 2024 | 12,127 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Shiloh Wind Project 2 LLC plant, and when do they retire?
1 operable generator totals 150 MW, with an average age of 16 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 1 | 150 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| TBD | Operating | Onshore Wind Turbine | 150 | 2009 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Shiloh Wind Project 2 LLC plant?
EIA lists no joint owners for Shiloh Wind Project 2 LLC. EDF Renewable Asset Holdings, Inc. operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Shiloh Wind Project 2 LLC plant?
Shiloh Wind Project 2 LLC is in Birds Landing, Solano County, California, at 38.1711° N, 121.8461° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in California are similar in size?
California has 111 operable wind plants with 6,479 MW of capacity, and Shiloh Wind Project 2 LLC's 150 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| North Sky River Energy LLC | Kern | 162 | 364,773 |
| Pacific Wind LLC | Kern | 152 | 294,749 |
| Shiloh I Wind Project | Solano | 150 | 399,952 |
| Shiloh Wind Project 2 LLC | Solano | 150 | 368,967 |
| Alta Wind Energy Center I | Kern | 150 | 399,786 |
| Alta Wind Energy Center II | Kern | 150 | 318,266 |
| Alta Wind Energy Center III | Kern | 150 | 318,266 |
Source: EIA Forms EIA-860 and EIA-923, 2025.