Wind power plant, Ohio

Northwest Ohio Wind power plant, Ohio

Northwest Ohio Wind is a 110 MW power plant, 105 MW of it wind, in Paulding County, Ohio, operated by Northwest Ohio Wind, LLC, and it generated 299,321 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Ohio, and its capacity factor sits at the 54th percentile of U.S. wind plants. By 2025 generation it ranks 1,975th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

110 MWNameplate capacity
34%Capacity factor, 2025, wind units, 54th percentile, on 100 MW net summer
0.2%Of OH generation, 2025
7 yearsAverage generator age, by MW

How hard does the Northwest Ohio Wind plant run compared with other wind plants?

The Northwest Ohio Wind plant's wind units had a capacity factor of 34% in 2025 on 100 MW of net summer capacity, the 54th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 125 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Northwest Ohio Wind34%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its wind generators only. Values above 105% are left out of the comparison.

Is the Northwest Ohio Wind plant generating more or less than last year?

Generation at Northwest Ohio Wind rose 10.6% from 2024 to 2025, from 270,548 MWh to 299,321 MWh. Through August 2026 it is running 1.7% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024270,548
2025299,321
2026 through August200,562
2025, same months197,195
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20268,236
July 202610,943
June 202622,774
May 202623,663
April 202633,047
March 202637,240
February 202624,974
January 202639,685
December 202537,023
November 202532,999
October 202525,231
September 20256,873
August 20257,550
July 202510,767
June 202521,305
May 202524,513
April 202528,930
March 202538,352
February 202528,043
January 202537,735
December 202430,609
November 202424,707
October 202417,032
September 20249,782
August 20248,488
July 202412,363
June 202423,200
May 202417,827
April 202431,844
March 202435,093
February 202428,576
January 202431,027

Source: EIA Form EIA-923, through August 2026.

How much of Ohio's electricity comes from the Northwest Ohio Wind plant?

Northwest Ohio Wind made 0.2% of the 145,060,499 MWh reported by Ohio plants in 2025, from 0.3% of the state's 34,392 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 52nd largest of 215 plants in Ohio, the 2,448th largest of 14,327 in the U.S. and the 615th largest of 1,358 wind plants on its wind units alone. By 2025 generation it is the 46th largest of 187 generating plants in the state.

Northwest Ohio Wind within Ohio, 2025
MeasureThis plantOhioShare
Capacity (MW)11034,3920.3%
Generation (MWh)299,321145,060,4990.2%
Wind capacity (MW)1051,1009.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Northwest Ohio Wind plant, and when do they retire?

3 operable generators total 110 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s110596%none reported
2020s254%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
NWOH1OperatingOnshore Wind Turbine1052018n/a
NWO-BOperatingBatteries12021n/a
NWO-SOperatingSolar Photovoltaic42021n/a
NWOH2CancelledOnshore Wind Turbine100n/an/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Northwest Ohio Wind plant?

2 owners report shares in Northwest Ohio Wind; NorthStar Clean Energy holds the largest named share, 47.8% or about 52.5 MW. Northwest Ohio Wind, LLC operates the plant. The listed shares add up to 95.6% of capacity; generators without joint owners are not on this list.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
NorthStar Clean Energy47.8%52143,105
ArcLight Capital Partners LLC47.8%52143,105

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

What fuels does the Northwest Ohio Wind plant use?

Northwest Ohio Wind has capacity on 3 fuels: 96% wind, 4% solar and 1% battery and pumped storage. In 2025, wind made 100% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Wind10595.6%299,321
Solar43.6%0
Battery and pumped storage10.7%0

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Northwest Ohio Wind plant?

Northwest Ohio Wind is in Haviland, Paulding County, Ohio, at 41.0169° N, 84.5936° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Ohio are similar in size?

Ohio has 22 operable wind plants with 1,100 MW of capacity, and Northwest Ohio Wind's 105 MW is 10% of that.

Wind plants in Ohio around this size
PlantCountyMW2025 MWh
Timber Road IVPaulding125394,557
Northwest Ohio WindPaulding105299,321
Paulding Wind Farm IIIPaulding101320,278
Paulding Wind Farm IIPaulding99318,322
Hog Creek Wind ProjectHardin66203,042

Source: EIA Forms EIA-860 and EIA-923, 2025.