Wind power plant, Ohio
Northwest Ohio Wind power plant, Ohio
Northwest Ohio Wind is a 110 MW power plant, 105 MW of it wind, in Paulding County, Ohio, operated by Northwest Ohio Wind, LLC, and it generated 299,321 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Ohio, and its capacity factor sits at the 54th percentile of U.S. wind plants. By 2025 generation it ranks 1,975th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Northwest Ohio Wind plant run compared with other wind plants?
The Northwest Ohio Wind plant's wind units had a capacity factor of 34% in 2025 on 100 MW of net summer capacity, the 54th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 125 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Northwest Ohio Wind | 34% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its wind generators only. Values above 105% are left out of the comparison.
Is the Northwest Ohio Wind plant generating more or less than last year?
Generation at Northwest Ohio Wind rose 10.6% from 2024 to 2025, from 270,548 MWh to 299,321 MWh. Through August 2026 it is running 1.7% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 270,548 |
| 2025 | 299,321 |
| 2026 through August | 200,562 |
| 2025, same months | 197,195 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 8,236 |
| July 2026 | 10,943 |
| June 2026 | 22,774 |
| May 2026 | 23,663 |
| April 2026 | 33,047 |
| March 2026 | 37,240 |
| February 2026 | 24,974 |
| January 2026 | 39,685 |
| December 2025 | 37,023 |
| November 2025 | 32,999 |
| October 2025 | 25,231 |
| September 2025 | 6,873 |
| August 2025 | 7,550 |
| July 2025 | 10,767 |
| June 2025 | 21,305 |
| May 2025 | 24,513 |
| April 2025 | 28,930 |
| March 2025 | 38,352 |
| February 2025 | 28,043 |
| January 2025 | 37,735 |
| December 2024 | 30,609 |
| November 2024 | 24,707 |
| October 2024 | 17,032 |
| September 2024 | 9,782 |
| August 2024 | 8,488 |
| July 2024 | 12,363 |
| June 2024 | 23,200 |
| May 2024 | 17,827 |
| April 2024 | 31,844 |
| March 2024 | 35,093 |
| February 2024 | 28,576 |
| January 2024 | 31,027 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Northwest Ohio Wind plant, and when do they retire?
3 operable generators total 110 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 105 | 96% | none reported |
| 2020s | 2 | 5 | 4% | none reported |
Every generator, 4 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| NWOH1 | Operating | Onshore Wind Turbine | 105 | 2018 | n/a |
| NWO-B | Operating | Batteries | 1 | 2021 | n/a |
| NWO-S | Operating | Solar Photovoltaic | 4 | 2021 | n/a |
| NWOH2 | Cancelled | Onshore Wind Turbine | 100 | n/a | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Northwest Ohio Wind plant?
2 owners report shares in Northwest Ohio Wind; NorthStar Clean Energy holds the largest named share, 47.8% or about 52.5 MW. Northwest Ohio Wind, LLC operates the plant. The listed shares add up to 95.6% of capacity; generators without joint owners are not on this list.
| Owner | Share | MW | 2025 MWh, by share |
|---|---|---|---|
| NorthStar Clean Energy | 47.8% | 52 | 143,105 |
| ArcLight Capital Partners LLC | 47.8% | 52 | 143,105 |
Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.
What fuels does the Northwest Ohio Wind plant use?
Northwest Ohio Wind has capacity on 3 fuels: 96% wind, 4% solar and 1% battery and pumped storage. In 2025, wind made 100% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Wind | 105 | 95.6% | 299,321 |
| Solar | 4 | 3.6% | 0 |
| Battery and pumped storage | 1 | 0.7% | 0 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Northwest Ohio Wind plant?
Northwest Ohio Wind is in Haviland, Paulding County, Ohio, at 41.0169° N, 84.5936° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Ohio are similar in size?
Ohio has 22 operable wind plants with 1,100 MW of capacity, and Northwest Ohio Wind's 105 MW is 10% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Timber Road IV | Paulding | 125 | 394,557 |
| Northwest Ohio Wind | Paulding | 105 | 299,321 |
| Paulding Wind Farm III | Paulding | 101 | 320,278 |
| Paulding Wind Farm II | Paulding | 99 | 318,322 |
| Hog Creek Wind Project | Hardin | 66 | 203,042 |
Source: EIA Forms EIA-860 and EIA-923, 2025.