Wind power plant, Ohio
Timber Road IV wind power plant, Ohio
Timber Road IV is a 125 MW wind power plant in Paulding County, Ohio, operated by Paulding Wind Farm IV LLC, and it generated 394,557 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Ohio, and its capacity factor sits at the 60th percentile of U.S. wind plants. By 2025 generation it ranks 1,605th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Timber Road IV plant run compared with other wind plants?
The Timber Road IV plant had a capacity factor of 36% in 2025 on 125 MW of net summer capacity, the 60th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 131 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Timber Road IV | 36% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Timber Road IV plant generating more or less than last year?
Generation at Timber Road IV rose 3.4% from 2024 to 2025, from 381,635 MWh to 394,557 MWh. Through August 2026 it is running 3.5% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 381,635 |
| 2025 | 394,557 |
| 2026 through August | 268,102 |
| 2025, same months | 259,146 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 15,673 |
| July 2026 | 15,538 |
| June 2026 | 30,974 |
| May 2026 | 34,457 |
| April 2026 | 45,462 |
| March 2026 | 46,317 |
| February 2026 | 31,042 |
| January 2026 | 48,639 |
| December 2025 | 45,819 |
| November 2025 | 39,621 |
| October 2025 | 37,201 |
| September 2025 | 12,770 |
| August 2025 | 14,792 |
| July 2025 | 14,802 |
| June 2025 | 26,981 |
| May 2025 | 32,339 |
| April 2025 | 36,992 |
| March 2025 | 48,654 |
| February 2025 | 33,840 |
| January 2025 | 50,746 |
| December 2024 | 43,368 |
| November 2024 | 40,614 |
| October 2024 | 28,444 |
| September 2024 | 21,466 |
| August 2024 | 16,078 |
| July 2024 | 16,569 |
| June 2024 | 30,996 |
| May 2024 | 26,766 |
| April 2024 | 43,668 |
| March 2024 | 47,386 |
| February 2024 | 36,508 |
| January 2024 | 29,772 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Timber Road IV plant, and when do they retire?
1 operable generator totals 125 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 125 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| TRIV | Operating | Onshore Wind Turbine | 125 | 2020 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Timber Road IV plant?
EIA lists no joint owners for Timber Road IV. Paulding Wind Farm IV LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Timber Road IV plant?
Timber Road IV is in Payne, Paulding County, Ohio, at 41.1210° N, 84.7510° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Ohio are similar in size?
Ohio has 22 operable wind plants with 1,100 MW of capacity, and Timber Road IV's 125 MW is 11% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Scioto Ridge Wind Farm | Logan | 250 | 524,468 |
| Timber Road IV | Paulding | 125 | 394,557 |
| Northwest Ohio Wind | Paulding | 105 | 299,321 |
| Paulding Wind Farm III | Paulding | 101 | 320,278 |
| Paulding Wind Farm II | Paulding | 99 | 318,322 |
Source: EIA Forms EIA-860 and EIA-923, 2025.