Orange Blossom Solar Center is a 74.5 MW solar power plant in Indian River County, Florida, operated by Florida Power & Light Co, and it generated 151,526 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 51st percentile of U.S. solar plants. By 2025 generation it ranks 2,889th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.5 MWNameplate capacity
23%Capacity factor, 2025, 51st percentile, on 74.5 MW net summer
0.1%Of FL generation, 2025
4 yearsAverage generator age, by MW

How hard does the Orange Blossom Solar Center plant run compared with other solar plants?

The Orange Blossom Solar Center plant had a capacity factor of 23% in 2025 on 74.5 MW of net summer capacity, the 51st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 85 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Orange Blossom Solar Center23%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Orange Blossom Solar Center plant generating more or less than last year?

Generation at Orange Blossom Solar Center rose 1.8% from 2024 to 2025, from 148,830 MWh to 151,526 MWh. Through August 2026 it is running 1.3% behind the same months of 2025.

Net generation by period
PeriodMWh
2024148,830
2025151,526
2026 through August103,052
2025, same months104,400
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202613,007
July 202613,844
June 202613,545
May 202614,836
April 202613,865
March 202613,481
February 202610,402
January 202610,072
December 202511,649
November 202511,924
October 202512,473
September 202511,080
August 202513,519
July 202513,322
June 202513,384
May 202513,663
April 202515,966
March 202514,635
February 202510,523
January 20259,388
December 202410,455
November 202410,578
October 202411,224
September 202411,525
August 202412,066
July 202412,549
June 202412,617
May 202415,725
April 202416,356
March 202413,879
February 202412,758
January 20249,098

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Orange Blossom Solar Center plant?

Orange Blossom Solar Center made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 105th largest of 331 plants in Florida, the 3,163rd largest of 14,327 in the U.S. and the 657th largest of 7,223 solar plants. By 2025 generation it is the 151st largest of 313 generating plants in the state.

Orange Blossom Solar Center within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)151,526267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Orange Blossom Solar Center plant, and when do they retire?

1 operable generator totals 74.5 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic752021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Orange Blossom Solar Center plant?

EIA lists no joint owners for Orange Blossom Solar Center. Florida Power & Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Florida Power & Light Co charge homes?

Florida Power & Light Co, the operator of Orange Blossom Solar Center, had an average residential price of 14.62¢ per kWh and an average bill of $162 a month in 2025, 4% below the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Florida Power & Light Co14.62¢$1624% lower
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Orange Blossom Solar Center plant?

Orange Blossom Solar Center is in Vero Beach, Indian River County, Florida, at 27.5969° N, 80.5707° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Orange Blossom Solar Center's 74.5 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Magnolia Springs Solar CenterClay75120,759
Trailside Solar CenterSt Johns75135,550
Rodeo Solar CenterDeSoto75145,035
Orange Blossom Solar CenterIndian River75151,526
Palm Bay SolarBrevard75150,270
Lakeside Solar CenterOkeechobee75148,979
Union Springs Solar CenterUnion75148,690