Skip to main content
RateWatt

Solar power plant, Florida

Union Springs Solar Center, Florida

Union Springs Solar Center is a 74.5 MW solar power plant in Union County, Florida, operated by Florida Power & Light Co, and it generated 148,690 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 47th percentile of U.S. solar plants. By 2025 generation it ranks 2,918th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.5 MWNameplate capacity
23%Capacity factor, 2025, 47th percentile, on 74.5 MW net summer
0.1%Of FL generation, 2025
5 yearsAverage generator age, by MW

How hard does the Union Springs Solar Center plant run compared with other solar plants?

The Union Springs Solar Center plant had a capacity factor of 23% in 2025 on 74.5 MW of net summer capacity, the 47th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 83 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Union Springs Solar Center23%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Union Springs Solar Center plant generating more or less than last year?

Generation at Union Springs Solar Center rose 1.8% from 2024 to 2025, from 146,030 MWh to 148,690 MWh. Through August 2026 it is running 1.0% behind the same months of 2025.

Net generation by period
PeriodMWh
2024146,030
2025148,690
2026 through August103,404
2025, same months104,491
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202613,394
July 202615,171
June 202614,614
May 202613,982
April 202615,045
March 202613,746
February 20268,404
January 20269,048
December 20257,969
November 202511,024
October 202511,619
September 202513,587
August 202513,720
July 202515,082
June 202514,837
May 202515,152
April 202514,403
March 202512,546
February 20259,583
January 20259,168
December 20247,780
November 20249,011
October 202411,459
September 20249,905
August 202413,696
July 202414,385
June 202415,275
May 202416,300
April 202416,706
March 202412,267
February 202410,802
January 20248,444

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Union Springs Solar Center plant?

Union Springs Solar Center made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 105th largest of 331 plants in Florida, the 3,163rd largest of 14,327 in the U.S. and the 660th largest of 7,223 solar plants. By 2025 generation it is the 159th largest of 313 generating plants in the state.

Union Springs Solar Center within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)148,690267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Union Springs Solar Center plant, and when do they retire?

1 operable generator totals 74.5 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic752020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Union Springs Solar Center plant?

EIA lists no joint owners for Union Springs Solar Center. Florida Power & Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Florida Power & Light Co charge homes?

Florida Power & Light Co, the operator of Union Springs Solar Center, had an average residential price of 14.62¢ per kWh and an average bill of $162 a month in 2025, 4% below the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Florida Power & Light Co14.62¢$1624% lower
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Union Springs Solar Center plant?

Union Springs Solar Center is in Lake Butler, Union County, Florida, at 29.9740° N, 82.3010° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Union Springs Solar Center's 74.5 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Orange Blossom Solar CenterIndian River75151,526
Palm Bay SolarBrevard75150,270
Lakeside Solar CenterOkeechobee75148,979
Union Springs Solar CenterUnion75148,690
Pelican Solar CenterSt Lucie75151,334
Egret Solar CenterBaker75127,114
Discovery Solar CenterBrevard75139,484

Source: EIA Forms EIA-860 and EIA-923, 2025.