Skip to main content
RateWatt

Solar power plant, Florida

Lakeside Solar Center, Florida

Lakeside Solar Center is a 74.5 MW solar power plant in Okeechobee County, Florida, operated by Florida Power & Light Co, and it generated 148,979 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 48th percentile of U.S. solar plants. By 2025 generation it ranks 2,916th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.5 MWNameplate capacity
23%Capacity factor, 2025, 48th percentile, on 74.5 MW net summer
0.1%Of FL generation, 2025
5 yearsAverage generator age, by MW

How hard does the Lakeside Solar Center plant run compared with other solar plants?

The Lakeside Solar Center plant had a capacity factor of 23% in 2025 on 74.5 MW of net summer capacity, the 48th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 83 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Lakeside Solar Center23%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Lakeside Solar Center plant generating more or less than last year?

Generation at Lakeside Solar Center rose 8.3% from 2024 to 2025, from 137,559 MWh to 148,979 MWh. Through August 2026 it is running 3.7% behind the same months of 2025.

Net generation by period
PeriodMWh
2024137,559
2025148,979
2026 through August99,132
2025, same months102,939
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202612,560
July 202613,430
June 202613,079
May 202614,157
April 202614,191
March 202612,861
February 20269,679
January 20269,175
December 202510,700
November 202511,056
October 202512,366
September 202511,918
August 202512,784
July 202513,007
June 202512,746
May 202514,186
April 202515,047
March 202514,300
February 202512,019
January 20258,850
December 20249,667
November 20249,731
October 202410,288
September 202411,656
August 202410,705
July 202412,264
June 202411,519
May 202413,352
April 202414,273
March 202413,496
February 202412,242
January 20248,366

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Lakeside Solar Center plant?

Lakeside Solar Center made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 105th largest of 331 plants in Florida, the 3,163rd largest of 14,327 in the U.S. and the 659th largest of 7,223 solar plants. By 2025 generation it is the 157th largest of 313 generating plants in the state.

Lakeside Solar Center within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)148,979267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Lakeside Solar Center plant, and when do they retire?

1 operable generator totals 74.5 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic752020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Lakeside Solar Center plant?

EIA lists no joint owners for Lakeside Solar Center. Florida Power & Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Florida Power & Light Co charge homes?

Florida Power & Light Co, the operator of Lakeside Solar Center, had an average residential price of 14.62¢ per kWh and an average bill of $162 a month in 2025, 4% below the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Florida Power & Light Co14.62¢$1624% lower
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Lakeside Solar Center plant?

Lakeside Solar Center is in Okeechobee, Okeechobee County, Florida, at 27.2142° N, 80.7446° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Lakeside Solar Center's 74.5 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Rodeo Solar CenterDeSoto75145,035
Orange Blossom Solar CenterIndian River75151,526
Palm Bay SolarBrevard75150,270
Lakeside Solar CenterOkeechobee75148,979
Union Springs Solar CenterUnion75148,690
Pelican Solar CenterSt Lucie75151,334
Egret Solar CenterBaker75127,114

Source: EIA Forms EIA-860 and EIA-923, 2025.