Wind power plant, Oregon
Pebble Springs Wind LLC power plant, Oregon
Pebble Springs Wind LLC is a 98.7 MW wind power plant in Gilliam County, Oregon, operated by Avangrid Power LLC, and it generated 194,228 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Oregon, and its capacity factor sits at the 15th percentile of U.S. wind plants. By 2025 generation it ranks 2,539th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Pebble Springs Wind LLC plant run compared with other wind plants?
The Pebble Springs Wind LLC plant had a capacity factor of 22% in 2025 on 98.7 MW of net summer capacity, the 15th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 82 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Pebble Springs Wind LLC | 22% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Pebble Springs Wind LLC plant generating more or less than last year?
Generation at Pebble Springs Wind LLC fell 11.3% from 2024 to 2025, from 219,023 MWh to 194,228 MWh.
| Period | MWh |
|---|---|
| 2024 | 219,023 |
| 2025 | 194,228 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 13,872 |
| November 2025 | 7,422 |
| October 2025 | 13,291 |
| September 2025 | 14,276 |
| August 2025 | 19,460 |
| July 2025 | 24,105 |
| June 2025 | 26,524 |
| May 2025 | 25,012 |
| April 2025 | 19,471 |
| March 2025 | 18,245 |
| February 2025 | 7,498 |
| January 2025 | 5,052 |
| December 2024 | 9,288 |
| November 2024 | 12,298 |
| October 2024 | 13,849 |
| September 2024 | 19,856 |
| August 2024 | 22,297 |
| July 2024 | 23,117 |
| June 2024 | 25,239 |
| May 2024 | 30,911 |
| April 2024 | 24,606 |
| March 2024 | 13,490 |
| February 2024 | 13,236 |
| January 2024 | 10,836 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Pebble Springs Wind LLC plant, and when do they retire?
1 operable generator totals 98.7 MW, with an average age of 16 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 1 | 99 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Onshore Wind Turbine | 99 | 2009 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Pebble Springs Wind LLC plant?
EIA lists no joint owners for Pebble Springs Wind LLC. Avangrid Power LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Pebble Springs Wind LLC plant?
Pebble Springs Wind LLC is in Wasco, Gilliam County, Oregon, at 45.7119° N, 120.1250° W. It sits in the Avangrid Renewables LLC balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Oregon are similar in size?
Oregon has 50 operable wind plants with 4,181 MW of capacity, and Pebble Springs Wind LLC's 98.7 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Hay Canyon Wind Power LLC | Sherman | 101 | 172,196 |
| Elkhorn Valley Wind Farm | Union | 101 | 305,806 |
| Wheatridge 1 | Morrow | 100 | 250,315 |
| Pebble Springs Wind LLC | Gilliam | 99 | 194,228 |
| Star Point Wind Project LLC | Sherman | 99 | 201,326 |
| Klondike Windpower II | Sherman | 75 | 235,838 |
| Willow Creek Energy Center | Morrow | 72 | 157,702 |
Source: EIA Forms EIA-860 and EIA-923, 2025.