Skip to main content
RateWatt

Wind power plant, Oregon

Wheatridge 1 wind power plant, Oregon

Wheatridge 1 is a 100 MW wind power plant in Morrow County, Oregon, operated by Portland General Electric Co, and it generated 250,315 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Oregon, and its capacity factor sits at the 34th percentile of U.S. wind plants. By 2025 generation it ranks 2,235th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

100 MWNameplate capacity
29%Capacity factor, 2025, 34th percentile, on 100 MW net summer
0.4%Of OR generation, 2025
5 yearsAverage generator age, by MW

How hard does the Wheatridge 1 plant run compared with other wind plants?

The Wheatridge 1 plant had a capacity factor of 29% in 2025 on 100 MW of net summer capacity, the 34th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 104 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Wheatridge 129%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Wheatridge 1 plant generating more or less than last year?

Generation at Wheatridge 1 fell 16.4% from 2024 to 2025, from 299,273 MWh to 250,315 MWh. Through August 2026 it is running 7.6% behind the same months of 2025.

Net generation by period
PeriodMWh
2024299,273
2025250,315
2026 through August166,185
2025, same months179,866
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202621,536
July 202622,625
June 202627,431
May 202624,137
April 202625,080
March 202627,014
February 202610,030
January 20268,332
December 202523,022
November 202513,687
October 202518,615
September 202515,125
August 202521,756
July 202526,903
June 202529,286
May 202529,038
April 202524,370
March 202527,939
February 202512,732
January 20257,842
December 202416,655
November 202425,833
October 202418,493
September 202423,051
August 202425,825
July 202427,679
June 202428,434
May 202438,321
April 202431,215
March 202425,195
February 202421,549
January 202417,023

Source: EIA Form EIA-923, through August 2026.

How much of Oregon's electricity comes from the Wheatridge 1 plant?

Wheatridge 1 made 0.4% of the 64,124,656 MWh reported by Oregon plants in 2025, from 0.5% of the state's 19,040 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 42nd largest of 302 plants in Oregon, the 2,602nd largest of 14,327 in the U.S. and the 677th largest of 1,358 wind plants. By 2025 generation it is the 33rd largest of 278 generating plants in the state.

Wheatridge 1 within Oregon, 2025
MeasureThis plantOregonShare
Capacity (MW)10019,0400.5%
Generation (MWh)250,31564,124,6560.4%
Wind capacity (MW)1004,1812.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Wheatridge 1 plant, and when do they retire?

1 operable generator totals 100 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1100100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
WNDOperatingOnshore Wind Turbine1002020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Wheatridge 1 plant?

EIA lists no joint owners for Wheatridge 1. Portland General Electric Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Portland General Electric Co charge homes?

Portland General Electric Co, the operator of Wheatridge 1, had an average residential price of 18.79¢ per kWh and an average bill of $142 a month in 2025, 22% above the Oregon average of 15.46¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Oregon
Portland General Electric Co18.79¢$14222% higher
Oregon average15.46¢$134
U.S. average17.23¢$15111% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Wheatridge 1 plant?

Wheatridge 1 is in Lexington, Morrow County, Oregon, at 45.5598° N, 119.6338° W. It sits in the Bonneville Power Administration balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Oregon are similar in size?

Oregon has 50 operable wind plants with 4,181 MW of capacity, and Wheatridge 1's 100 MW is 2% of that.

Wind plants in Oregon around this size
PlantCountyMW2025 MWh
Vansycle II Wind Energy CenterUmatilla102320,128
Hay Canyon Wind Power LLCSherman101172,196
Elkhorn Valley Wind FarmUnion101305,806
Wheatridge 1Morrow100250,315
Pebble Springs Wind LLCGilliam99194,228
Star Point Wind Project LLCSherman99201,326
Klondike Windpower IISherman75235,838

Source: EIA Forms EIA-860 and EIA-923, 2025.