Hydro power plant, Texas
RC Thomas Hydroelectric Project, Texas
RC Thomas Hydroelectric Project is a 26.7 MW hydro power plant in Polk County, Texas, operated by East Texas Electric Coop, Inc, and it generated 123,586 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 94th percentile of U.S. hydro plants. By 2025 generation it ranks 3,164th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the RC Thomas Hydroelectric Project plant run compared with other hydro plants?
The RC Thomas Hydroelectric Project plant had a capacity factor of 58% in 2025 on 24.3 MW of net summer capacity, the 94th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 212 days at full output out of 365.
0%Shaded: the middle half of hydro plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| RC Thomas Hydroelectric Project | 58% |
| Hydro plants, 75th percentile | 44% |
| Hydro plants, median | 33% |
| Hydro plants, 25th percentile | 22% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the RC Thomas Hydroelectric Project plant generating more or less than last year?
Generation at RC Thomas Hydroelectric Project rose 7.2% from 2024 to 2025, from 115,339 MWh to 123,586 MWh. Through August 2026 it is running 9.3% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 115,339 |
| 2025 | 123,586 |
| 2026 through August | 87,300 |
| 2025, same months | 96,205 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 4,856 |
| July 2026 | 11,517 |
| June 2026 | 16,482 |
| May 2026 | 15,937 |
| April 2026 | 14,528 |
| March 2026 | 11,134 |
| February 2026 | 7,761 |
| January 2026 | 5,085 |
| December 2025 | 8,814 |
| November 2025 | 5,681 |
| October 2025 | 5,587 |
| September 2025 | 7,299 |
| August 2025 | 5,318 |
| July 2025 | 14,081 |
| June 2025 | 12,796 |
| May 2025 | 14,805 |
| April 2025 | 15,930 |
| March 2025 | 10,265 |
| February 2025 | 10,421 |
| January 2025 | 12,589 |
| December 2024 | 7,909 |
| November 2024 | 5,703 |
| October 2024 | 6,637 |
| September 2024 | 6,159 |
| August 2024 | 10,910 |
| July 2024 | 14,986 |
| June 2024 | 13,240 |
| May 2024 | 9,024 |
| April 2024 | 14,167 |
| March 2024 | 10,962 |
| February 2024 | 2,007 |
| January 2024 | 13,635 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the RC Thomas Hydroelectric Project plant, and when do they retire?
3 operable generators total 26.7 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 3 | 27 | 100% | none reported |
Every generator, 3 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| RCT1 | Operating | Conventional Hydroelectric | 9 | 2020 | n/a |
| RCT2 | Operating | Conventional Hydroelectric | 9 | 2020 | n/a |
| RCT3 | Operating | Conventional Hydroelectric | 9 | 2020 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the RC Thomas Hydroelectric Project plant?
EIA lists no joint owners for RC Thomas Hydroelectric Project. East Texas Electric Coop, Inc operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the RC Thomas Hydroelectric Project plant?
RC Thomas Hydroelectric Project is in Livingston, Polk County, Texas, at 30.6322° N, 95.0100° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which hydro plants in Texas are similar in size?
Texas has 23 operable hydro plants with 735 MW of capacity, and RC Thomas Hydroelectric Project's 26.7 MW is 4% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Whitney | Bosque | 42 | 66,931 |
| Marble Falls | Burnet | 40 | 23,788 |
| Falcon Dam & Power | Starr | 32 | 8,508 |
| RC Thomas Hydroelectric Project | Polk | 27 | 123,586 |
| Austin | Travis | 18 | 9,688 |
| Inks | Burnet | 15 | 14,321 |
Source: EIA Forms EIA-860 and EIA-923, 2025.