Solar power plant, California
RE Rosamond Two LLC solar power plant, California
RE Rosamond Two LLC is a 20 MW solar power plant in Kern County, California, operated by MN8 Energy LLC, and it generated 48,584 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 81st percentile of U.S. solar plants. By 2025 generation it ranks 4,129th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the RE Rosamond Two LLC plant run compared with other solar plants?
The RE Rosamond Two LLC plant had a capacity factor of 28% in 2025 on 20 MW of net summer capacity, the 81st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 101 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| RE Rosamond Two LLC | 28% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the RE Rosamond Two LLC plant generating more or less than last year?
Generation at RE Rosamond Two LLC rose 0.6% from 2024 to 2025, from 48,284 MWh to 48,584 MWh.
| Period | MWh |
|---|---|
| 2024 | 48,284 |
| 2025 | 48,584 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 2,309 |
| November 2025 | 2,262 |
| October 2025 | 3,857 |
| September 2025 | 4,124 |
| August 2025 | 4,958 |
| July 2025 | 5,718 |
| June 2025 | 5,569 |
| May 2025 | 5,233 |
| April 2025 | 4,805 |
| March 2025 | 3,980 |
| February 2025 | 2,892 |
| January 2025 | 2,877 |
| December 2024 | 2,366 |
| November 2024 | 2,655 |
| October 2024 | 3,479 |
| September 2024 | 4,016 |
| August 2024 | 5,130 |
| July 2024 | 5,379 |
| June 2024 | 5,389 |
| May 2024 | 5,726 |
| April 2024 | 4,732 |
| March 2024 | 4,114 |
| February 2024 | 2,782 |
| January 2024 | 2,516 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the RE Rosamond Two LLC plant, and when do they retire?
1 operable generator totals 20 MW, with an average age of 11 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 20 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| RTWO | Operating | Solar Photovoltaic | 20 | 2014 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the RE Rosamond Two LLC plant?
RE Rosamond Two LLC is the only joint owner reported for RE Rosamond Two LLC, with 100.0%. MN8 Energy LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the RE Rosamond Two LLC plant?
RE Rosamond Two LLC is in Rosamond, Kern County, California, at 34.9003° N, 118.2383° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and RE Rosamond Two LLC's 20 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| White River Solar | Tulare | 20 | 36,137 |
| Corcoran Solar | Kings | 20 | 22,105 |
| RE Rosamond One LLC | Kern | 20 | 51,204 |
| RE Rosamond Two LLC | Kern | 20 | 48,584 |
| Sol Orchard El Centro PV | Imperial | 20 | 45,147 |
| Western Antelope Blue Sky Ranch A | Los Angeles | 20 | 43,001 |
| RE Kansas Solar, LLC | Kings | 20 | 23,996 |
Source: EIA Forms EIA-860 and EIA-923, 2025.