Solar power plant, California
Corcoran Solar power plant, California
Corcoran Solar is a 20 MW solar power plant in Kings County, California, operated by RWE Clean Energy, and it generated 22,105 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 9th percentile of U.S. solar plants. By 2025 generation it ranks 5,129th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Corcoran Solar plant run compared with other solar plants?
The Corcoran Solar plant had a capacity factor of 13% in 2025 on 20 MW of net summer capacity, the 9th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 46 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Corcoran Solar | 13% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Corcoran Solar plant generating more or less than last year?
Generation at Corcoran Solar fell 36.2% from 2024 to 2025, from 34,621 MWh to 22,105 MWh.
| Period | MWh |
|---|---|
| 2024 | 34,621 |
| 2025 | 22,105 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 781 |
| November 2025 | 1,490 |
| October 2025 | 1,541 |
| September 2025 | 1,693 |
| August 2025 | 3,632 |
| July 2025 | 3,086 |
| June 2025 | 2,395 |
| May 2025 | 1,947 |
| April 2025 | 926 |
| March 2025 | 1,462 |
| February 2025 | 1,257 |
| January 2025 | 1,895 |
| December 2024 | 1,618 |
| November 2024 | 1,990 |
| October 2024 | 2,154 |
| September 2024 | 3,366 |
| August 2024 | 4,607 |
| July 2024 | 5,348 |
| June 2024 | 3,874 |
| May 2024 | 1,608 |
| April 2024 | 2,567 |
| March 2024 | 3,079 |
| February 2024 | 2,534 |
| January 2024 | 1,876 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Corcoran Solar plant, and when do they retire?
1 operable generator totals 20 MW, with an average age of 12 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 20 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CSCA | Operating | Solar Photovoltaic | 20 | 2013 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Corcoran Solar plant?
EIA lists no joint owners for Corcoran Solar. RWE Clean Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Corcoran Solar plant?
Corcoran Solar is in Corcoran, Kings County, California, at 36.1383° N, 119.5733° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Corcoran Solar's 20 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| TA-High Desert LLC | Los Angeles | 20 | 57,851 |
| RE Victor Phelan Solar One LLC | San Bernardino | 20 | 45,053 |
| White River Solar | Tulare | 20 | 36,137 |
| Corcoran Solar | Kings | 20 | 22,105 |
| RE Rosamond One LLC | Kern | 20 | 51,204 |
| RE Rosamond Two LLC | Kern | 20 | 48,584 |
| Sol Orchard El Centro PV | Imperial | 20 | 45,147 |
Source: EIA Forms EIA-860 and EIA-923, 2025.