Solar power plant, California
TA-High Desert LLC solar power plant, California
TA-High Desert LLC is a 20 MW solar power plant in Los Angeles County, California, operated by TA-High Desert LLC, and it generated 57,851 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 98th percentile of U.S. solar plants. By 2025 generation it ranks 3,910th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the TA-High Desert LLC plant run compared with other solar plants?
The TA-High Desert LLC plant had a capacity factor of 33% in 2025 on 20 MW of net summer capacity, the 98th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 121 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| TA-High Desert LLC | 33% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the TA-High Desert LLC plant generating more or less than last year?
Generation at TA-High Desert LLC rose 1.8% from 2024 to 2025, from 56,825 MWh to 57,851 MWh.
| Period | MWh |
|---|---|
| 2024 | 56,825 |
| 2025 | 57,851 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 2,857 |
| November 2025 | 2,807 |
| October 2025 | 4,570 |
| September 2025 | 4,909 |
| August 2025 | 5,812 |
| July 2025 | 6,792 |
| June 2025 | 6,530 |
| May 2025 | 6,214 |
| April 2025 | 5,834 |
| March 2025 | 4,548 |
| February 2025 | 3,499 |
| January 2025 | 3,479 |
| December 2024 | 2,830 |
| November 2024 | 3,102 |
| October 2024 | 4,271 |
| September 2024 | 5,052 |
| August 2024 | 5,970 |
| July 2024 | 6,194 |
| June 2024 | 6,498 |
| May 2024 | 6,614 |
| April 2024 | 5,478 |
| March 2024 | 4,536 |
| February 2024 | 3,234 |
| January 2024 | 3,046 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the TA-High Desert LLC plant, and when do they retire?
1 operable generator totals 20 MW, with an average age of 12 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 20 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| TAHD | Operating | Solar Photovoltaic | 20 | 2013 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the TA-High Desert LLC plant?
EIA lists no joint owners for TA-High Desert LLC. TA-High Desert LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the TA-High Desert LLC plant?
TA-High Desert LLC is in Lancaster, Los Angeles County, California, at 34.7089° N, 118.3047° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and TA-High Desert LLC's 20 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Gates Solar Station | Fresno | 20 | 30,509 |
| Alpaugh North | Tulare | 20 | 21,051 |
| RE Kansas South LLC | Kings | 20 | 50,544 |
| TA-High Desert LLC | Los Angeles | 20 | 57,851 |
| RE Victor Phelan Solar One LLC | San Bernardino | 20 | 45,053 |
| White River Solar | Tulare | 20 | 36,137 |
| Corcoran Solar | Kings | 20 | 22,105 |
Source: EIA Forms EIA-860 and EIA-923, 2025.