Solar power plant, California

TA-High Desert LLC solar power plant, California

TA-High Desert LLC is a 20 MW solar power plant in Los Angeles County, California, operated by TA-High Desert LLC, and it generated 57,851 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 98th percentile of U.S. solar plants. By 2025 generation it ranks 3,910th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20 MWNameplate capacity
33%Capacity factor, 2025, 98th percentile, on 20 MW net summer
3,910thU.S. rank by generation, 2025
12 yearsAverage generator age, by MW

How hard does the TA-High Desert LLC plant run compared with other solar plants?

The TA-High Desert LLC plant had a capacity factor of 33% in 2025 on 20 MW of net summer capacity, the 98th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 121 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
TA-High Desert LLC33%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the TA-High Desert LLC plant generating more or less than last year?

Generation at TA-High Desert LLC rose 1.8% from 2024 to 2025, from 56,825 MWh to 57,851 MWh.

Net generation by period
PeriodMWh
202456,825
202557,851
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20252,857
November 20252,807
October 20254,570
September 20254,909
August 20255,812
July 20256,792
June 20256,530
May 20256,214
April 20255,834
March 20254,548
February 20253,499
January 20253,479
December 20242,830
November 20243,102
October 20244,271
September 20245,052
August 20245,970
July 20246,194
June 20246,498
May 20246,614
April 20245,478
March 20244,536
February 20243,234
January 20243,046

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the TA-High Desert LLC plant?

TA-High Desert LLC made 0.0% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. Its share of output is 1.5 times its share of capacity. By capacity it is the 619th largest of 1,877 plants in California, the 4,775th largest of 14,327 in the U.S. and the 1,092nd largest of 7,223 solar plants. By 2025 generation it is the 414th largest of 1,608 generating plants in the state.

TA-High Desert LLC within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)20107,4330.0%
Generation (MWh)57,851204,542,8980.0%
Solar capacity (MW)2024,6630.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the TA-High Desert LLC plant, and when do they retire?

1 operable generator totals 20 MW, with an average age of 12 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
TAHDOperatingSolar Photovoltaic202013n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the TA-High Desert LLC plant?

EIA lists no joint owners for TA-High Desert LLC. TA-High Desert LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the TA-High Desert LLC plant?

TA-High Desert LLC is in Lancaster, Los Angeles County, California, at 34.7089° N, 118.3047° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and TA-High Desert LLC's 20 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Gates Solar StationFresno2030,509
Alpaugh NorthTulare2021,051
RE Kansas South LLCKings2050,544
TA-High Desert LLCLos Angeles2057,851
RE Victor Phelan Solar One LLCSan Bernardino2045,053
White River SolarTulare2036,137
Corcoran SolarKings2022,105

Source: EIA Forms EIA-860 and EIA-923, 2025.