White River Solar is a 20 MW solar power plant in Tulare County, California, operated by RWE Clean Energy, and it generated 36,137 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 30th percentile of U.S. solar plants. By 2025 generation it ranks 4,498th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the White River Solar plant run compared with other solar plants?
The White River Solar plant had a capacity factor of 21% in 2025 on 20 MW of net summer capacity, the 30th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 75 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| White River Solar | 21% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the White River Solar plant generating more or less than last year?
Generation at White River Solar fell 18.5% from 2024 to 2025, from 44,344 MWh to 36,137 MWh.
| Period | MWh |
|---|---|
| 2024 | 44,344 |
| 2025 | 36,137 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 839 |
| November 2025 | 1,663 |
| October 2025 | 2,615 |
| September 2025 | 3,758 |
| August 2025 | 4,919 |
| July 2025 | 5,295 |
| June 2025 | 4,548 |
| May 2025 | 4,831 |
| April 2025 | 2,452 |
| March 2025 | 1,496 |
| February 2025 | 1,155 |
| January 2025 | 2,566 |
| December 2024 | 1,689 |
| November 2024 | 1,593 |
| October 2024 | 2,689 |
| September 2024 | 4,157 |
| August 2024 | 5,391 |
| July 2024 | 5,488 |
| June 2024 | 5,773 |
| May 2024 | 5,773 |
| April 2024 | 3,714 |
| March 2024 | 3,580 |
| February 2024 | 2,665 |
| January 2024 | 1,832 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the White River Solar plant, and when do they retire?
1 operable generator totals 20 MW, with an average age of 12 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 20 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| WRCA | Operating | Solar Photovoltaic | 20 | 2013 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the White River Solar plant?
EIA lists no joint owners for White River Solar. RWE Clean Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the White River Solar plant?
White River Solar is in Alpaugh, Tulare County, California, at 35.8714° N, 119.4625° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and White River Solar's 20 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| RE Kansas South LLC | Kings | 20 | 50,544 |
| TA-High Desert LLC | Los Angeles | 20 | 57,851 |
| RE Victor Phelan Solar One LLC | San Bernardino | 20 | 45,053 |
| White River Solar | Tulare | 20 | 36,137 |
| Corcoran Solar | Kings | 20 | 22,105 |
| RE Rosamond One LLC | Kern | 20 | 51,204 |
| RE Rosamond Two LLC | Kern | 20 | 48,584 |
Source: EIA Forms EIA-860 and EIA-923, 2025.