Solar power plant, California
Redwood 4 Solar Farm, California
Redwood 4 Solar Farm is a 20 MW solar power plant in Kern County, California, operated by 54 KR 8me LLC, and it generated 18,905 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 7th percentile of U.S. solar plants. By 2025 generation it ranks 5,317th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Redwood 4 Solar Farm plant run compared with other solar plants?
The Redwood 4 Solar Farm plant had a capacity factor of 11% in 2025 on 20 MW of net summer capacity, the 7th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 39 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Redwood 4 Solar Farm | 11% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Redwood 4 Solar Farm plant generating more or less than last year?
Generation at Redwood 4 Solar Farm fell 52.6% from 2024 to 2025, from 39,852 MWh to 18,905 MWh.
| Period | MWh |
|---|---|
| 2024 | 39,852 |
| 2025 | 18,905 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 51 |
| November 2025 | 349 |
| October 2025 | 340 |
| September 2025 | 1,301 |
| August 2025 | 1,286 |
| July 2025 | 2,904 |
| June 2025 | 3,712 |
| May 2025 | 4,301 |
| April 2025 | 1,648 |
| March 2025 | 800 |
| February 2025 | 492 |
| January 2025 | 1,721 |
| December 2024 | 1,276 |
| November 2024 | 1,011 |
| October 2024 | 2,593 |
| September 2024 | 3,945 |
| August 2024 | 4,995 |
| July 2024 | 4,794 |
| June 2024 | 5,184 |
| May 2024 | 5,458 |
| April 2024 | 3,329 |
| March 2024 | 2,860 |
| February 2024 | 2,444 |
| January 2024 | 1,963 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Redwood 4 Solar Farm plant, and when do they retire?
1 operable generator totals 20 MW, with an average age of 8 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 20 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| RW4SF | Operating | Solar Photovoltaic | 20 | 2017 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Redwood 4 Solar Farm plant?
EIA lists no joint owners for Redwood 4 Solar Farm. 54 KR 8me LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Redwood 4 Solar Farm plant?
Redwood 4 Solar Farm is in Edison, Kern County, California, at 35.3142° N, 118.8119° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Redwood 4 Solar Farm's 20 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Bayshore Solar C, LLC | Los Angeles | 20 | 40,642 |
| Bayshore Solar A, LLC | Los Angeles | 20 | 44,379 |
| Longboat Solar, LLC | San Bernardino | 20 | 54,332 |
| Redwood 4 Solar Farm | Kern | 20 | 18,905 |
| Solar Blythe 2 | Riverside | 20 | 40,700 |
| Jacumba Solar Farm | San Diego | 20 | 46,262 |
| Whitney Point Solar | Fresno | 20 | 54,152 |
Source: EIA Forms EIA-860 and EIA-923, 2025.