Solar power plant, California

Whitney Point Solar power plant, California

Whitney Point Solar is a 20 MW solar power plant in Fresno County, California, operated by Whitney Point Solar, LLC, and it generated 54,152 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 94th percentile of U.S. solar plants. By 2025 generation it ranks 3,996th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20 MWNameplate capacity
31%Capacity factor, 2025, 94th percentile, on 20 MW net summer
3,996thU.S. rank by generation, 2025
8 yearsAverage generator age, by MW

How hard does the Whitney Point Solar plant run compared with other solar plants?

The Whitney Point Solar plant had a capacity factor of 31% in 2025 on 20 MW of net summer capacity, the 94th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 113 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Whitney Point Solar31%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Whitney Point Solar plant generating more or less than last year?

Generation at Whitney Point Solar rose 21.8% from 2024 to 2025, from 44,443 MWh to 54,152 MWh.

Net generation by period
PeriodMWh
202444,443
202554,152
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20251,188
November 20252,127
October 20254,153
September 20254,258
August 20255,871
July 20256,828
June 20256,828
May 20256,652
April 20255,295
March 20254,478
February 20253,257
January 20253,217
December 20242,227
November 20242,875
October 20244,015
September 20244,888
August 20245,827
July 20246,355
June 20245,656
May 20244,852
April 20241,935
March 20241,254
February 20242,216
January 20242,343

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Whitney Point Solar plant?

Whitney Point Solar made 0.0% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. Its share of output is 1.4 times its share of capacity. By capacity it is the 619th largest of 1,877 plants in California, the 4,775th largest of 14,327 in the U.S. and the 1,190th largest of 7,223 solar plants. By 2025 generation it is the 428th largest of 1,608 generating plants in the state.

Whitney Point Solar within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)20107,4330.0%
Generation (MWh)54,152204,542,8980.0%
Solar capacity (MW)2024,6630.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Whitney Point Solar plant, and when do they retire?

1 operable generator totals 20 MW, with an average age of 8 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
WS532OperatingSolar Photovoltaic202017n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Whitney Point Solar plant?

EIA lists no joint owners for Whitney Point Solar. Whitney Point Solar, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Whitney Point Solar plant?

Whitney Point Solar is in Five Points, Fresno County, California, at 36.3769° N, 120.1385° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Whitney Point Solar's 20 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Redwood 4 Solar FarmKern2018,905
Solar Blythe 2Riverside2040,700
Jacumba Solar FarmSan Diego2046,262
Whitney Point SolarFresno2054,152
NextEra Westside PVFresno2025,668
Antelope DSR 3Los Angeles2055,108
Gaskell West 1 Solar FacilityKern2055,559

Source: EIA Forms EIA-860 and EIA-923, 2025.