Solar Blythe 2 power plant, California

Solar Blythe 2 is a 20 MW solar power plant in Riverside County, California, operated by NRG Solar Blythe II LLC, and it generated 40,700 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 51st percentile of U.S. solar plants. By 2025 generation it ranks 4,339th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20 MWNameplate capacity
23%Capacity factor, 2025, 51st percentile, on 20 MW net summer
4,339thU.S. rank by generation, 2025
8 yearsAverage generator age, by MW

How hard does the Solar Blythe 2 plant run compared with other solar plants?

The Solar Blythe 2 plant had a capacity factor of 23% in 2025 on 20 MW of net summer capacity, the 51st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 85 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Solar Blythe 223%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Solar Blythe 2 plant generating more or less than last year?

Generation at Solar Blythe 2 rose 6.8% from 2024 to 2025, from 38,093 MWh to 40,700 MWh.

Net generation by period
PeriodMWh
202438,093
202540,700
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20252,467
November 20252,735
October 20252,825
September 20253,925
August 20255,192
July 20256,335
June 20255,678
May 20253,784
April 20252,034
March 20251,731
February 20251,232
January 20252,762
December 20242,674
November 20242,409
October 20243,828
September 20244,662
August 20245,502
July 20245,970
June 20244,737
May 20242,040
April 2024969
March 20241,097
February 20241,696
January 20242,509

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Solar Blythe 2 plant?

Solar Blythe 2 made 0.0% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. By capacity it is the 619th largest of 1,877 plants in California, the 4,775th largest of 14,327 in the U.S. and the 1,179th largest of 7,223 solar plants. By 2025 generation it is the 514th largest of 1,608 generating plants in the state.

Solar Blythe 2 within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)20107,4330.0%
Generation (MWh)40,700204,542,8980.0%
Solar capacity (MW)2024,6630.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Solar Blythe 2 plant, and when do they retire?

1 operable generator totals 20 MW, with an average age of 8 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PV1OperatingSolar Photovoltaic202017n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Solar Blythe 2 plant?

NRG Energy, Inc is the only joint owner reported for Solar Blythe 2, with 100.0%. NRG Solar Blythe II LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Solar Blythe 2 plant?

Solar Blythe 2 is in Blythe, Riverside County, California, at 33.6187° N, 114.6962° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Solar Blythe 2's 20 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Bayshore Solar A, LLCLos Angeles2044,379
Longboat Solar, LLCSan Bernardino2054,332
Redwood 4 Solar FarmKern2018,905
Solar Blythe 2Riverside2040,700
Jacumba Solar FarmSan Diego2046,262
Whitney Point SolarFresno2054,152
NextEra Westside PVFresno2025,668