Solar power plant, California
Solar Blythe 2 power plant, California
Solar Blythe 2 is a 20 MW solar power plant in Riverside County, California, operated by NRG Solar Blythe II LLC, and it generated 40,700 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 51st percentile of U.S. solar plants. By 2025 generation it ranks 4,339th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Solar Blythe 2 plant run compared with other solar plants?
The Solar Blythe 2 plant had a capacity factor of 23% in 2025 on 20 MW of net summer capacity, the 51st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 85 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Solar Blythe 2 | 23% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Solar Blythe 2 plant generating more or less than last year?
Generation at Solar Blythe 2 rose 6.8% from 2024 to 2025, from 38,093 MWh to 40,700 MWh.
| Period | MWh |
|---|---|
| 2024 | 38,093 |
| 2025 | 40,700 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 2,467 |
| November 2025 | 2,735 |
| October 2025 | 2,825 |
| September 2025 | 3,925 |
| August 2025 | 5,192 |
| July 2025 | 6,335 |
| June 2025 | 5,678 |
| May 2025 | 3,784 |
| April 2025 | 2,034 |
| March 2025 | 1,731 |
| February 2025 | 1,232 |
| January 2025 | 2,762 |
| December 2024 | 2,674 |
| November 2024 | 2,409 |
| October 2024 | 3,828 |
| September 2024 | 4,662 |
| August 2024 | 5,502 |
| July 2024 | 5,970 |
| June 2024 | 4,737 |
| May 2024 | 2,040 |
| April 2024 | 969 |
| March 2024 | 1,097 |
| February 2024 | 1,696 |
| January 2024 | 2,509 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Solar Blythe 2 plant, and when do they retire?
1 operable generator totals 20 MW, with an average age of 8 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 20 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| PV1 | Operating | Solar Photovoltaic | 20 | 2017 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Solar Blythe 2 plant?
NRG Energy, Inc is the only joint owner reported for Solar Blythe 2, with 100.0%. NRG Solar Blythe II LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Solar Blythe 2 plant?
Solar Blythe 2 is in Blythe, Riverside County, California, at 33.6187° N, 114.6962° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Solar Blythe 2's 20 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Bayshore Solar A, LLC | Los Angeles | 20 | 44,379 |
| Longboat Solar, LLC | San Bernardino | 20 | 54,332 |
| Redwood 4 Solar Farm | Kern | 20 | 18,905 |
| Solar Blythe 2 | Riverside | 20 | 40,700 |
| Jacumba Solar Farm | San Diego | 20 | 46,262 |
| Whitney Point Solar | Fresno | 20 | 54,152 |
| NextEra Westside PV | Fresno | 20 | 25,668 |
Source: EIA Forms EIA-860 and EIA-923, 2025.