Solar power plant, California

Antelope DSR 3 solar power plant, California

Antelope DSR 3 is a 20 MW solar power plant in Los Angeles County, California, operated by AES Distributed Energy, and it generated 55,108 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 95th percentile of U.S. solar plants. By 2025 generation it ranks 3,974th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20 MWNameplate capacity
31%Capacity factor, 2025, 95th percentile, on 20 MW net summer
3,974thU.S. rank by generation, 2025
6 yearsAverage generator age, by MW

How hard does the Antelope DSR 3 plant run compared with other solar plants?

The Antelope DSR 3 plant had a capacity factor of 31% in 2025 on 20 MW of net summer capacity, the 95th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 115 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Antelope DSR 331%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Antelope DSR 3 plant generating more or less than last year?

Generation at Antelope DSR 3 fell 4.4% from 2024 to 2025, from 57,669 MWh to 55,108 MWh.

Net generation by period
PeriodMWh
202457,669
202555,108
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20252,562
November 20252,548
October 20254,249
September 20254,517
August 20255,613
July 20256,462
June 20256,156
May 20256,239
April 20255,721
March 20254,016
February 20253,647
January 20253,378
December 20242,795
November 20243,089
October 20244,276
September 20245,043
August 20246,082
July 20246,413
June 20246,695
May 20246,718
April 20245,731
March 20244,502
February 20243,247
January 20243,078

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Antelope DSR 3 plant?

Antelope DSR 3 made 0.0% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. Its share of output is 1.4 times its share of capacity. By capacity it is the 619th largest of 1,877 plants in California, the 4,775th largest of 14,327 in the U.S. and the 1,193rd largest of 7,223 solar plants. By 2025 generation it is the 425th largest of 1,608 generating plants in the state.

Antelope DSR 3 within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)20107,4330.0%
Generation (MWh)55,108204,542,8980.0%
Solar capacity (MW)2024,6630.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Antelope DSR 3 plant, and when do they retire?

1 operable generator totals 20 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
ADSR3OperatingSolar Photovoltaic202019n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Antelope DSR 3 plant?

EIA lists no joint owners for Antelope DSR 3. AES Distributed Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Antelope DSR 3 plant?

Antelope DSR 3 is in Lancaster, Los Angeles County, California, at 34.7369° N, 118.3041° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Antelope DSR 3's 20 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Jacumba Solar FarmSan Diego2046,262
Whitney Point SolarFresno2054,152
NextEra Westside PVFresno2025,668
Antelope DSR 3Los Angeles2055,108
Gaskell West 1 Solar FacilityKern2055,559
RE Gaskell West 3 LLCKern2050,755
RE Gaskell West 4 LLCKern2047,509

Source: EIA Forms EIA-860 and EIA-923, 2025.