Skip to main content
RateWatt

Solar power plant, California

RE Gaskell West 3 LLC solar power plant, California

RE Gaskell West 3 LLC is a 20 MW solar power plant in Kern County, California, operated by RE Gaskell West LLC, and it generated 50,755 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 87th percentile of U.S. solar plants. By 2025 generation it ranks 4,075th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20 MWNameplate capacity
29%Capacity factor, 2025, 87th percentile, on 20 MW net summer
4,075thU.S. rank by generation, 2025
2 yearsAverage generator age, by MW

How hard does the RE Gaskell West 3 LLC plant run compared with other solar plants?

The RE Gaskell West 3 LLC plant had a capacity factor of 29% in 2025 on 20 MW of net summer capacity, the 87th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 106 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
RE Gaskell West 3 LLC29%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the RE Gaskell West 3 LLC plant generating more or less than last year?

Generation at RE Gaskell West 3 LLC rose 2.9% from 2024 to 2025, from 49,317 MWh to 50,755 MWh.

Net generation by period
PeriodMWh
202449,317
202550,755
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20253,281
November 20253,116
October 20254,204
September 20255,453
August 20256,610
July 20257,224
June 20256,112
May 20254,954
April 20252,947
March 20251,988
February 20251,689
January 20253,177
December 20242,741
November 20242,327
October 20243,138
September 20244,487
August 20242,819
July 20246,628
June 20246,902
May 20246,043
April 20243,847
March 20243,642
February 20243,412
January 20243,331

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the RE Gaskell West 3 LLC plant?

RE Gaskell West 3 LLC made 0.0% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 619th largest of 1,877 plants in California, the 4,775th largest of 14,327 in the U.S. and the 1,197th largest of 7,223 solar plants. By 2025 generation it is the 450th largest of 1,608 generating plants in the state.

RE Gaskell West 3 LLC within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)20107,4330.0%
Generation (MWh)50,755204,542,8980.0%
Solar capacity (MW)2024,6630.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the RE Gaskell West 3 LLC plant, and when do they retire?

1 operable generator totals 20 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PV3OperatingSolar Photovoltaic202023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the RE Gaskell West 3 LLC plant?

EIA lists no joint owners for RE Gaskell West 3 LLC. RE Gaskell West LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the RE Gaskell West 3 LLC plant?

RE Gaskell West 3 LLC is in Rosamond, Kern County, California, at 34.8349° N, 118.5512° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and RE Gaskell West 3 LLC's 20 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
NextEra Westside PVFresno2025,668
Antelope DSR 3Los Angeles2055,108
Gaskell West 1 Solar FacilityKern2055,559
RE Gaskell West 3 LLCKern2050,755
RE Gaskell West 4 LLCKern2047,509
RE Gaskell West 5 LLCKern2047,998
Little Bear 3Fresno2020,047

Source: EIA Forms EIA-860 and EIA-923, 2025.