Riverside Energy Center is a 675 MW natural gas power plant in Rock County, Wisconsin, operated by Wisconsin Power & Light Co, and it generated 3,307,977 MWh in 2025 (Forms EIA-860 and EIA-923). That is 5.0% of the generation reported in Wisconsin, and its capacity factor sits at the 86th percentile of U.S. natural gas plants. By 2025 generation it ranks 361st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

675 MWNameplate capacity
71%Capacity factor, 2025, 86th percentile, on 535 MW net summer
5.0%Of WI generation, 2025
21 yearsAverage generator age, by MW

How hard does the Riverside Energy Center plant run compared with other natural gas plants?

The Riverside Energy Center plant had a capacity factor of 71% in 2025 on 535 MW of net summer capacity, the 86th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 258 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Riverside Energy Center71%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Riverside Energy Center plant generating more or less than last year?

Generation at Riverside Energy Center fell 2.3% from 2024 to 2025, from 3,386,019 MWh to 3,307,977 MWh. Through August 2026 it is running 5.0% ahead of the same months of 2025.

Net generation by period
PeriodMWh
20243,386,019
20253,307,977
2026 through August2,340,948
2025, same months2,230,173
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026348,633
July 2026355,990
June 2026255,942
May 2026301,263
April 202671,587
March 2026356,032
February 2026319,287
January 2026332,214
December 2025358,827
November 2025299,824
October 2025273,154
September 2025145,999
August 2025361,442
July 2025370,781
June 2025335,156
May 2025305,386
April 202546,197
March 2025215,014
February 2025286,481
January 2025309,716
December 2024330,821
November 2024335,444
October 2024162,632
September 202471,435
August 2024373,578
July 2024363,568
June 2024319,654
May 2024364,135
April 2024131,684
March 2024336,209
February 2024235,364
January 2024361,495

Source: EIA Form EIA-923, through August 2026.

How much of Wisconsin's electricity comes from the Riverside Energy Center plant?

Riverside Energy Center made 5.0% of the 66,249,756 MWh reported by Wisconsin plants in 2025, from 3.5% of the state's 19,442 MW of capacity. Its share of output is 1.4 times its share of capacity. By capacity it is the 7th largest of 273 plants in Wisconsin, the 525th largest of 14,327 in the U.S. and the 313th largest of 1,962 natural gas plants. By 2025 generation it is the 8th largest of 259 generating plants in the state.

Riverside Energy Center within Wisconsin, 2025
MeasureThis plantWisconsinShare
Capacity (MW)67519,4423.5%
Generation (MWh)3,307,97766,249,7565.0%
Natural gas capacity (MW)6757,8248.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Riverside Energy Center plant, and when do they retire?

3 operable generators total 675 MW, with an average age of 21 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s3675100%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CTG1OperatingNatural Gas Fired Combined Cycle1992004n/a
CTG2OperatingNatural Gas Fired Combined Cycle1992004n/a
STG1OperatingNatural Gas Fired Combined Cycle2772004n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Riverside Energy Center plant?

EIA lists no joint owners for Riverside Energy Center. Wisconsin Power & Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Wisconsin Power & Light Co charge homes?

Wisconsin Power & Light Co, the operator of Riverside Energy Center, had an average residential price of 18.47¢ per kWh and an average bill of $128 a month in 2025, 2% above the Wisconsin average of 18.08¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Wisconsin
Wisconsin Power & Light Co18.47¢$1282% higher
Wisconsin average18.08¢$121
U.S. average17.23¢$1515% lower

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Riverside Energy Center plant?

Riverside Energy Center is in Beloit, Rock County, Wisconsin, at 42.5831° N, 89.0358° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Wisconsin are similar in size?

Wisconsin has 38 operable natural gas plants with 7,824 MW of capacity, and Riverside Energy Center's 675 MW is 9% of that.

Natural gas plants in Wisconsin around this size
PlantCountyMW2025 MWh
Port Washington Generating StationOzaukee1,2307,260,771
West Riverside Energy CenterRock7234,363,883
Riverside Energy CenterRock6753,307,977
Fox Energy CenterOutagamie6193,572,215
RockGen Energy CenterDane561492,053
ConcordJefferson382201,107