Skip to main content
RateWatt

Natural gas power plant, North Carolina

Rowan natural gas power plant, North Carolina

Rowan is a 1,192 MW natural gas power plant in Rowan County, North Carolina, operated by Southern Power Co, and it generated 4,296,911 MWh in 2025 (Forms EIA-860 and EIA-923). That is 3.2% of the generation reported in North Carolina, and its capacity factor sits at the 70th percentile of U.S. natural gas plants. By 2025 generation it ranks 262nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

1,192 MWNameplate capacity
50%Capacity factor, 2025, 70th percentile, on 974 MW net summer
3.2%Of NC generation, 2025
23 yearsAverage generator age, by MW

How hard does the Rowan plant run compared with other natural gas plants?

The Rowan plant had a capacity factor of 50% in 2025 on 974 MW of net summer capacity, the 70th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 183 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Rowan50%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Rowan plant generating more or less than last year?

Generation at Rowan rose 3.4% from 2024 to 2025, from 4,154,609 MWh to 4,296,911 MWh. Through August 2026 it is running 29.9% ahead of the same months of 2025.

Net generation by period
PeriodMWh
20244,154,609
20254,296,911
2026 through August3,605,304
2025, same months2,775,333
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026471,692
July 2026512,182
June 2026469,620
May 2026445,505
April 2026399,596
March 2026441,047
February 2026398,210
January 2026467,452
December 2025434,521
November 2025256,927
October 2025427,153
September 2025402,977
August 2025410,477
July 2025541,460
May 2025379,554
April 2025239,622
March 2025386,997
February 2025337,469
January 2025479,754
December 2024389,571
November 2024191,647
October 2024333,350
September 2024388,603
August 2024423,970
July 2024439,510
June 2024338,428
May 2024331,920
April 2024210,515
March 2024360,356
February 2024326,555
January 2024420,184

Source: EIA Form EIA-923, through August 2026.

How much of North Carolina's electricity comes from the Rowan plant?

Rowan made 3.2% of the 134,194,434 MWh reported by North Carolina plants in 2025, from 3.0% of the state's 39,933 MW of capacity. By capacity it is the 9th largest of 928 plants in North Carolina, the 228th largest of 14,327 in the U.S. and the 91st largest of 1,962 natural gas plants. By 2025 generation it is the 10th largest of 872 generating plants in the state.

Rowan within North Carolina, 2025
MeasureThis plantNorth CarolinaShare
Capacity (MW)1,19239,9333.0%
Generation (MWh)4,296,911134,194,4343.2%
Natural gas capacity (MW)1,19218,2696.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Rowan plant, and when do they retire?

6 operable generators total 1,192 MW, with an average age of 23 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s61,192100%none reported
Every generator, 6 in all
UnitStatusTechnologyMWIn servicePlanned retirement
001OperatingNatural Gas Fired Combustion Turbine1992001n/a
002OperatingNatural Gas Fired Combustion Turbine1992001n/a
003OperatingNatural Gas Fired Combustion Turbine1992001n/a
4OperatingNatural Gas Fired Combined Cycle1992003n/a
5OperatingNatural Gas Fired Combined Cycle1992003n/a
STGOperatingNatural Gas Fired Combined Cycle1952003n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Rowan plant?

EIA lists no joint owners for Rowan. Southern Power Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Rowan plant?

Rowan is in Salisbury, Rowan County, North Carolina, at 35.7314° N, 80.6019° W. It sits in the Duke Energy Carolinas balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in North Carolina are similar in size?

North Carolina has 21 operable natural gas plants with 18,269 MW of capacity, and Rowan's 1,192 MW is 7% of that.

Natural gas plants in North Carolina around this size
PlantCountyMW2025 MWh
Sherwood H Smith Jr Energy ComplexRichmond2,2459,848,308
Lincoln CombustionLincoln2,156957,136
James E. Rogers Energy ComplexCleveland1,5313,105,686
RowanRowan1,1924,272,488
Lee Combined Cycle PlantWayne1,0685,735,818
AshevilleBuncombe1,0123,653,058
Wayne County Energy ComplexWayne980559,320

Source: EIA Forms EIA-860 and EIA-923, 2025.