Wayne County Energy Complex is a 980 MW natural gas power plant in Wayne County, North Carolina, operated by Duke Energy Progress-(NC), and it generated 621,457 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in North Carolina, and its capacity factor sits at the 31st percentile of U.S. natural gas plants. By 2025 generation it ranks 1,102nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

980 MWNameplate capacity
8%Capacity factor, 2025, 31st percentile, on 822 MW net summer
0.5%Of NC generation, 2025
23 yearsAverage generator age, by MW

How hard does the Wayne County Energy Complex plant run compared with other natural gas plants?

The Wayne County Energy Complex plant had a capacity factor of 8% in 2025 on 822 MW of net summer capacity, the 31st percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 28 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Wayne County Energy Complex8%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Wayne County Energy Complex plant generating more or less than last year?

Generation at Wayne County Energy Complex rose 965.8% from 2024 to 2025, from 58,308 MWh to 621,457 MWh.

Net generation by period
PeriodMWh
202458,308
2025621,457
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202561,721
November 202545,111
October 202534,496
September 202553,507
August 202555,644
July 202569,561
June 202554,791
May 202544,766
April 202538,026
March 202538,957
February 202548,847
January 202576,029
December 20244,871
November 20244,410
October 20244,499
September 20245,041
August 20245,803
July 20245,733
June 20245,051
May 20244,040
April 20243,629
March 20243,349
February 20244,380
January 20247,502

Source: EIA Form EIA-923, through August 2026.

How much of North Carolina's electricity comes from the Wayne County Energy Complex plant?

Wayne County Energy Complex made 0.5% of the 134,194,434 MWh reported by North Carolina plants in 2025, from 2.5% of the state's 39,933 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 12th largest of 928 plants in North Carolina, the 318th largest of 14,327 in the U.S. and the 156th largest of 1,962 natural gas plants. By 2025 generation it is the 21st largest of 872 generating plants in the state.

Wayne County Energy Complex within North Carolina, 2025
MeasureThis plantNorth CarolinaShare
Capacity (MW)98039,9332.5%
Generation (MWh)621,457134,194,4340.5%
Natural gas capacity (MW)98018,2695.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Wayne County Energy Complex plant, and when do they retire?

5 operable generators total 980 MW, with an average age of 23 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s5980100%none reported
Every generator, 5 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingNatural Gas Fired Combustion Turbine1952000n/a
2OperatingNatural Gas Fired Combustion Turbine1952000n/a
3OperatingNatural Gas Fired Combustion Turbine1952000n/a
4OperatingNatural Gas Fired Combustion Turbine1952000n/a
5OperatingNatural Gas Fired Combustion Turbine1992009n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Wayne County Energy Complex plant?

EIA lists no joint owners for Wayne County Energy Complex. Duke Energy Progress-(NC) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Duke Energy Progress charge homes?

Duke Energy Progress, the operator of Wayne County Energy Complex, had an average residential price of 15.19¢ per kWh and an average bill of $159 a month in 2025, 9% above the North Carolina average of 14.00¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst North Carolina
Duke Energy Progress15.19¢$1599% higher
North Carolina average14.00¢$146
U.S. average17.23¢$15123% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Wayne County Energy Complex plant?

Wayne County Energy Complex is in Goldsboro, Wayne County, North Carolina, at 35.3758° N, 78.0981° W. It sits in the Duke Energy Progress East balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in North Carolina are similar in size?

North Carolina has 21 operable natural gas plants with 18,269 MW of capacity, and Wayne County Energy Complex's 980 MW is 5% of that.

Natural gas plants in North Carolina around this size
PlantCountyMW2025 MWh
RowanRowan1,1924,272,488
Lee Combined Cycle PlantWayne1,0685,735,818
AshevilleBuncombe1,0123,653,058
Wayne County Energy ComplexWayne980559,320
Rockingham County CT StationRockingham9781,798,021
L V Sutton Combined CycleNew Hanover8513,534,191
Cleveland Cnty Generating FacilityCleveland736980,687

Source: EIA Forms EIA-860 and EIA-923, 2025.