SE Athos II, LLC solar power plant, California

SE Athos II, LLC is a 200 MW solar power plant in Riverside County, California, operated by SE Athos II, LLC, and it generated 561,991 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in California, and its capacity factor sits at the 96th percentile of U.S. solar plants. By 2025 generation it ranks 1,208th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

200 MWNameplate capacity
32%Capacity factor, 2025, 96th percentile, on 200 MW net summer
0.3%Of CA generation, 2025
4 yearsAverage generator age, by MW

How hard does the SE Athos II, LLC plant run compared with other solar plants?

The SE Athos II, LLC plant had a capacity factor of 32% in 2025 on 200 MW of net summer capacity, the 96th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 117 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
SE Athos II, LLC32%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the SE Athos II, LLC plant generating more or less than last year?

Generation at SE Athos II, LLC rose 15.3% from 2024 to 2025, from 487,492 MWh to 561,991 MWh. Through August 2026 it is running 13.0% behind the same months of 2025.

Net generation by period
PeriodMWh
2024487,492
2025561,991
2026 through August350,761
2025, same months402,992
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202654,800
July 202646,223
June 202646,367
May 202663,579
April 202641,684
March 202635,296
February 202629,904
January 202632,908
December 202528,852
November 202533,623
October 202547,896
September 202548,628
August 202560,905
July 202568,275
June 202566,985
May 202557,956
April 202555,669
March 202528,731
February 202529,163
January 202535,308
December 202431,820
November 202437,377
October 202444,534
September 202454,515
August 202462,026
July 202465,358
June 202464,046
May 202441,128
April 202422,007
March 202415,882
February 202428,582
January 202420,217

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the SE Athos II, LLC plant?

SE Athos II, LLC made 0.3% of the 204,542,898 MWh reported by California plants in 2025, from 0.2% of the state's 107,433 MW of capacity. Its share of output is 1.5 times its share of capacity. By capacity it is the 122nd largest of 1,877 plants in California, the 1,524th largest of 14,327 in the U.S. and the 151st largest of 7,223 solar plants. By 2025 generation it is the 73rd largest of 1,608 generating plants in the state.

SE Athos II, LLC within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)200107,4330.2%
Generation (MWh)561,991204,542,8980.3%
Solar capacity (MW)20024,6630.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the SE Athos II, LLC plant, and when do they retire?

1 operable generator totals 200 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 3 more are proposed, totalling 402 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1200100%none reported
Every generator, 5 in all
UnitStatusTechnologyMWIn servicePlanned retirement
IPAT2OperatingSolar Photovoltaic2002021n/a
ATH1NUnder construction, under half builtBatteries1002027n/a
ATH1SUnder construction, under half builtBatteries1022027n/a
ATHB2Under construction, under half builtBatteries2002027n/a
SEAT2CancelledSolar Photovoltaic200n/an/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the SE Athos II, LLC plant?

EIA lists no joint owners for SE Athos II, LLC. SE Athos II, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the SE Athos II, LLC plant?

SE Athos II, LLC is in Desert Center, Riverside County, California, at 33.7513° N, 115.3550° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and SE Athos II, LLC's 200 MW is 1% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
RE TranquillityFresno205495,073
Great Valley Solar Portfolio Holdings, LFresno203503,173
Wright Solar ParkMerced200402,717
SE Athos II, LLCRiverside200561,991
Scarlet Solar (CA)Fresno200488,817
Sandrini Solar 200Kern200411,296
Victory PassRiverside200585,624