Solar power plant, California
SE Athos II, LLC solar power plant, California
SE Athos II, LLC is a 200 MW solar power plant in Riverside County, California, operated by SE Athos II, LLC, and it generated 561,991 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in California, and its capacity factor sits at the 96th percentile of U.S. solar plants. By 2025 generation it ranks 1,208th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the SE Athos II, LLC plant run compared with other solar plants?
The SE Athos II, LLC plant had a capacity factor of 32% in 2025 on 200 MW of net summer capacity, the 96th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 117 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| SE Athos II, LLC | 32% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the SE Athos II, LLC plant generating more or less than last year?
Generation at SE Athos II, LLC rose 15.3% from 2024 to 2025, from 487,492 MWh to 561,991 MWh. Through August 2026 it is running 13.0% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 487,492 |
| 2025 | 561,991 |
| 2026 through August | 350,761 |
| 2025, same months | 402,992 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 54,800 |
| July 2026 | 46,223 |
| June 2026 | 46,367 |
| May 2026 | 63,579 |
| April 2026 | 41,684 |
| March 2026 | 35,296 |
| February 2026 | 29,904 |
| January 2026 | 32,908 |
| December 2025 | 28,852 |
| November 2025 | 33,623 |
| October 2025 | 47,896 |
| September 2025 | 48,628 |
| August 2025 | 60,905 |
| July 2025 | 68,275 |
| June 2025 | 66,985 |
| May 2025 | 57,956 |
| April 2025 | 55,669 |
| March 2025 | 28,731 |
| February 2025 | 29,163 |
| January 2025 | 35,308 |
| December 2024 | 31,820 |
| November 2024 | 37,377 |
| October 2024 | 44,534 |
| September 2024 | 54,515 |
| August 2024 | 62,026 |
| July 2024 | 65,358 |
| June 2024 | 64,046 |
| May 2024 | 41,128 |
| April 2024 | 22,007 |
| March 2024 | 15,882 |
| February 2024 | 28,582 |
| January 2024 | 20,217 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the SE Athos II, LLC plant, and when do they retire?
1 operable generator totals 200 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 3 more are proposed, totalling 402 MW.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 200 | 100% | none reported |
Every generator, 5 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| IPAT2 | Operating | Solar Photovoltaic | 200 | 2021 | n/a |
| ATH1N | Under construction, under half built | Batteries | 100 | 2027 | n/a |
| ATH1S | Under construction, under half built | Batteries | 102 | 2027 | n/a |
| ATHB2 | Under construction, under half built | Batteries | 200 | 2027 | n/a |
| SEAT2 | Cancelled | Solar Photovoltaic | 200 | n/a | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the SE Athos II, LLC plant?
EIA lists no joint owners for SE Athos II, LLC. SE Athos II, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the SE Athos II, LLC plant?
SE Athos II, LLC is in Desert Center, Riverside County, California, at 33.7513° N, 115.3550° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and SE Athos II, LLC's 200 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| RE Tranquillity | Fresno | 205 | 495,073 |
| Great Valley Solar Portfolio Holdings, L | Fresno | 203 | 503,173 |
| Wright Solar Park | Merced | 200 | 402,717 |
| SE Athos II, LLC | Riverside | 200 | 561,991 |
| Scarlet Solar (CA) | Fresno | 200 | 488,817 |
| Sandrini Solar 200 | Kern | 200 | 411,296 |
| Victory Pass | Riverside | 200 | 585,624 |
Source: EIA Forms EIA-860 and EIA-923, 2025.