Solar power plant, California

Sandrini Solar 200 power plant, California

Sandrini Solar 200 is a 200 MW solar power plant in Kern County, California, operated by EDPR CA Solar Park LLC, and it generated 411,296 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 53rd percentile of U.S. solar plants. By 2025 generation it ranks 1,556th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

200 MWNameplate capacity
23%Capacity factor, 2025, 53rd percentile, on 200 MW net summer
0.2%Of CA generation, 2025
1 yearAverage generator age, by MW

How hard does the Sandrini Solar 200 plant run compared with other solar plants?

The Sandrini Solar 200 plant had a capacity factor of 23% in 2025 on 200 MW of net summer capacity, the 53rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 86 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Sandrini Solar 20023%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Sandrini Solar 200 plant generating more or less than last year?

Sandrini Solar 200 generated 411,296 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 29.5% ahead of the same months of 2025. 2024 has output for only 2 months, so the two years are not compared.

Net generation by period
PeriodMWh
202442,859
2025411,296
2026 through August389,701
2025, same months301,026
Monthly generation, Nov 2024 to Aug 2026
MonthMWh
August 202653,523
July 202661,657
June 202665,937
May 202659,156
April 202648,424
March 202647,684
February 202629,884
January 202623,436
December 202510,719
November 202519,763
October 202540,652
September 202539,136
August 202537,679
July 202535,212
June 202553,581
May 202555,396
April 202539,088
March 202526,603
February 202521,479
January 202531,988
December 202419,763
November 202423,096

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Sandrini Solar 200 plant?

Sandrini Solar 200 made 0.2% of the 204,542,898 MWh reported by California plants in 2025, from 0.2% of the state's 107,433 MW of capacity. By capacity it is the 122nd largest of 1,877 plants in California, the 1,524th largest of 14,327 in the U.S. and the 163rd largest of 7,223 solar plants. By 2025 generation it is the 105th largest of 1,608 generating plants in the state.

Sandrini Solar 200 within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)200107,4330.2%
Generation (MWh)411,296204,542,8980.2%
Solar capacity (MW)20024,6630.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Sandrini Solar 200 plant, and when do they retire?

1 operable generator totals 200 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1200100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN01OperatingSolar Photovoltaic2002024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Sandrini Solar 200 plant?

EIA lists no joint owners for Sandrini Solar 200. EDPR CA Solar Park LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Sandrini Solar 200 plant?

Sandrini Solar 200 is in Mettler, Kern County, California, at 35.1026° N, 119.0541° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Sandrini Solar 200's 200 MW is 1% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Wright Solar ParkMerced200402,717
SE Athos II, LLCRiverside200561,991
Scarlet Solar (CA)Fresno200488,817
Sandrini Solar 200Kern200411,296
Victory PassRiverside200585,624
Scarlet II HybridFresno200403,487
Luna ValleyFresno200134,619

Source: EIA Forms EIA-860 and EIA-923, 2025.